1,179 delay minutes

The biggest share (24%) of the delay picked up at Grimsby Town in the four weeks to 9 December 2023 came from outside causes like vandalism, cable theft, animals and fires.

46% of these minutes were knock-on from something that happened elsewhere first. 81% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track141%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power14312%16% 5 a day, more than 3 of the other 4 years-
Weather and structures202%7% 1 a day, more than 3 of the other 4 years-
Autumn23520%7% 8 a day, more than 3 of the other 4 years-
External28824%4% 10 a day, the most in 5 years1
Network management20718%17% 7 a day, more than 3 of the other 4 years-
The operators' causes
Train faults202%16% 1 a day, the least in 5 years-
Traincrew847%11% 3 a day, more than 3 of the other 4 years1
Stations222%3% 1 a day, more than 3 of the other 4 years1
Operations282%5% 1 a day, the most in 5 years-
Operator, other12010%7% 4 a day, the most in 5 years1

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)257
QJSpecial working for leaf-fall track circuit operation119
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)112
Q3NZ Pumps T87
TGDriver65
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles49
TTLeaf fall Neutral48
MPRail / wheel interface, adhesion problems (including ice on the running rail)39
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure36
XPBRIDGE HIT31
Since 2018
CodeWhat Network Rail loggedMinutes
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)4,856
TGDriver2,991
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles2,470
MDTechnical failures below the solebar1,387
OCSignaller including mis-routing (not ERTM /ETCS related)1,211
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,203
TH(Senior) Conductor/Train Manager981
M8Technical failures above the Solebar887
QJSpecial working for leaf-fall track circuit operation846
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)788