Great Missenden
0 delay minutes
No delay was picked up at Great Missenden in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 159 |
| QB | Planned engineering work - diversion/SLW not timetabled (outside the Timetable Planning Rules) | 114 |
| MD | Technical failures below the solebar | 44 |
| QJ | Special working for leaf-fall track circuit operation | 37 |
| VX | External events occurring on the LUL or other non NR running lines | 26 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 24 |
| IB | Points failure (including no fault found) | 19 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 19 |
| TG | Driver | 16 |
| TZ | Other Passenger Train Operating Company causes | 14 |