Leaves on the Line

Great Malvern

GMV Central route
CSV JSON

1,477 delay minutes

The biggest share (28%) of the delay picked up at Great Malvern in the four weeks to 9 December 2023 came from signal, points and power faults.

73% of these minutes were knock-on from something that happened elsewhere first. 83% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1218%8% 4 a day, more than 1 of the other 4 years3
Signals, points and power41828%16% 15 a day, the most in 5 years15
Weather and structures22215%7% 8 a day, the most in 5 years4
Autumn--7% 0 a day, the least in 5 years-
External262%4% 1 a day, the least in 5 years-
Network management20214%17% 7 a day, more than 1 of the other 4 years12
The operators' causes
Train faults19913%16% 7 a day, the least in 5 years9
Traincrew18112%11% 6 a day, more than 3 of the other 4 years21
Stations524%3% 2 a day, more than 2 of the other 4 years-
Operations14<1%5% 1 a day, more than 2 of the other 4 years-
Operator, other423%7% 2 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)272
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)180
TGDriver131
M8Technical failures above the Solebar108
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.65
TH(Senior) Conductor/Train Manager50
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure40
IASignal failure (including no fault found)35
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles34
MPRail / wheel interface, adhesion problems (including ice on the running rail)30
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver5,760
ZUNo Cause Identified After investigation by both Parties3,441
IBPoints failure (including no fault found)3,329
MDTechnical failures below the solebar3,218
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,837
M8Technical failures above the Solebar2,787
IASignal failure (including no fault found)2,382
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,284
ICTrack circuit failure (including no fault found)1,989
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)1,926