Great Malvern
1,477 delay minutes
The biggest share (28%) of the delay picked up at Great Malvern in the four weeks to 9 December 2023 came from signal, points and power faults.
73% of these minutes were knock-on from something that happened elsewhere first. 83% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 121 | 8% | 8% | 4 a day, more than 1 of the other 4 years | 3 |
| Signals, points and power | 418 | 28% | 16% | 15 a day, the most in 5 years | 15 |
| Weather and structures | 222 | 15% | 7% | 8 a day, the most in 5 years | 4 |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | 26 | 2% | 4% | 1 a day, the least in 5 years | - |
| Network management | 202 | 14% | 17% | 7 a day, more than 1 of the other 4 years | 12 |
| The operators' causes | |||||
| Train faults | 199 | 13% | 16% | 7 a day, the least in 5 years | 9 |
| Traincrew | 181 | 12% | 11% | 6 a day, more than 3 of the other 4 years | 21 |
| Stations | 52 | 4% | 3% | 2 a day, more than 2 of the other 4 years | - |
| Operations | 14 | <1% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 42 | 3% | 7% | 2 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 272 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 180 |
| TG | Driver | 131 |
| M8 | Technical failures above the Solebar | 108 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 65 |
| TH | (Senior) Conductor/Train Manager | 50 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 40 |
| IA | Signal failure (including no fault found) | 35 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 34 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 30 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 5,760 |
| ZU | No Cause Identified After investigation by both Parties | 3,441 |
| IB | Points failure (including no fault found) | 3,329 |
| MD | Technical failures below the solebar | 3,218 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,837 |
| M8 | Technical failures above the Solebar | 2,787 |
| IA | Signal failure (including no fault found) | 2,382 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,284 |
| IC | Track circuit failure (including no fault found) | 1,989 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 1,926 |