5 delay minutes

Most of the delay picked up at Green Lane in the four weeks to 9 December 2023 came from traincrew problems.

0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew5100%11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver5
Since 2018
CodeWhat Network Rail loggedMinutes
TH(Senior) Conductor/Train Manager27
TGDriver19
XPBRIDGE HIT10
MDTechnical failures below the solebar8
M0Confirmed train cab based safety system fault (including GSMR)5
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)4
IHPower Supply And Distribution System Failure3