1,429 delay minutes
The biggest share (26%) of the delay picked up at Goole in the four weeks to 9 December 2023 came from autumn leaves.
50% of these minutes were knock-on from something that happened elsewhere first. 84% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 41 | 3% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 305 | 21% | 16% | 11 a day, the most in 5 years | - |
| Weather and structures | 70 | 5% | 7% | 3 a day, more than 3 of the other 4 years | - |
| Autumn | 372 | 26% | 7% | 13 a day, the most in 5 years | - |
| External | 95 | 7% | 4% | 3 a day, the most in 5 years | - |
| Network management | 223 | 16% | 17% | 8 a day, more than 2 of the other 4 years | 4 |
| The operators' causes | |||||
| Train faults | 90 | 6% | 16% | 3 a day, more than 2 of the other 4 years | 1 |
| Traincrew | 88 | 6% | 11% | 3 a day, the most in 5 years | 3 |
| Stations | 42 | 3% | 3% | 2 a day, the most in 5 years | - |
| Operations | 48 | 3% | 5% | 2 a day, the most in 5 years | - |
| Operator, other | 56 | 4% | 7% | 2 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| QJ | Special working for leaf-fall track circuit operation | 323 |
| OU | Delays not Investigated by Network Rail | 144 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 120 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 97 |
| TG | Driver | 60 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 56 |
| Q3 | NZ Pumps T | 46 |
| TT | Leaf fall Neutral | 46 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 45 |
| IC | Track circuit failure (including no fault found) | 36 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JS | Condition of Track TSR outside the Timetable Planning Rules | 3,898 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 2,266 |
| XQ | Swing bridge open for river or canal traffic | 1,892 |
| IC | Track circuit failure (including no fault found) | 1,741 |
| TG | Driver | 1,703 |
| QJ | Special working for leaf-fall track circuit operation | 1,439 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,319 |
| IB | Points failure (including no fault found) | 1,217 |
| MD | Technical failures below the solebar | 1,141 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 1,110 |