1,429 delay minutes

The biggest share (26%) of the delay picked up at Goole in the four weeks to 9 December 2023 came from autumn leaves.

50% of these minutes were knock-on from something that happened elsewhere first. 84% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track413%8% 1 a day, the least in 5 years-
Signals, points and power30521%16% 11 a day, the most in 5 years-
Weather and structures705%7% 3 a day, more than 3 of the other 4 years-
Autumn37226%7% 13 a day, the most in 5 years-
External957%4% 3 a day, the most in 5 years-
Network management22316%17% 8 a day, more than 2 of the other 4 years4
The operators' causes
Train faults906%16% 3 a day, more than 2 of the other 4 years1
Traincrew886%11% 3 a day, the most in 5 years3
Stations423%3% 2 a day, the most in 5 years-
Operations483%5% 2 a day, the most in 5 years-
Operator, other564%7% 2 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QJSpecial working for leaf-fall track circuit operation323
OUDelays not Investigated by Network Rail144
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure120
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles97
TGDriver60
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail56
Q3NZ Pumps T46
TTLeaf fall Neutral46
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)45
ICTrack circuit failure (including no fault found)36
Since 2018
CodeWhat Network Rail loggedMinutes
JSCondition of Track TSR outside the Timetable Planning Rules3,898
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)2,266
XQSwing bridge open for river or canal traffic1,892
ICTrack circuit failure (including no fault found)1,741
TGDriver1,703
QJSpecial working for leaf-fall track circuit operation1,439
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,319
IBPoints failure (including no fault found)1,217
MDTechnical failures below the solebar1,141
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)1,110