Gospel Oak
1,845 delay minutes
The biggest share (21%) of the delay picked up at Gospel Oak in the four weeks to 9 December 2023 came from how the network was run.
84% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 157 | 9% | 8% | 6 a day, more than 3 of the other 4 years | 3 |
| Signals, points and power | 340 | 18% | 16% | 12 a day, more than 3 of the other 4 years | - |
| Weather and structures | 67 | 4% | 7% | 2 a day, more than 3 of the other 4 years | - |
| Autumn | 11 | <1% | 7% | 0 a day, the most in 5 years | - |
| External | 111 | 6% | 4% | 4 a day, the most in 5 years | - |
| Network management | 380 | 21% | 17% | 14 a day, more than 2 of the other 4 years | 15 |
| The operators' causes | |||||
| Train faults | 153 | 8% | 16% | 5 a day, the least in 5 years | 7 |
| Traincrew | 161 | 9% | 11% | 6 a day, the least in 5 years | 1 |
| Stations | 102 | 6% | 3% | 4 a day, more than 1 of the other 4 years | - |
| Operations | 217 | 12% | 5% | 8 a day, the most in 5 years | - |
| Operator, other | 147 | 8% | 7% | 5 a day, more than 1 of the other 4 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IA | Signal failure (including no fault found) | 178 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 156 |
| TG | Driver | 118 |
| IH | Power Supply And Distribution System Failure | 104 |
| RB | Passengers joining/alighting | 95 |
| M8 | Technical failures above the Solebar | 90 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 86 |
| OB | Delayed by signaller not applying applicable regulating policy | 76 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 68 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 62 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 12,112 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,514 |
| MD | Technical failures below the solebar | 4,310 |
| RB | Passengers joining/alighting | 4,219 |
| IB | Points failure (including no fault found) | 3,817 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 3,535 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 3,505 |
| J3 | Axle Counter Failure | 3,015 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 2,384 |
| M8 | Technical failures above the Solebar | 2,350 |