738 delay minutes

The biggest share (35%) of the delay picked up at Grove Park in the four weeks to 9 December 2023 came from how the network was run.

76% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track405%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power111%16% 0 a day, the least in 5 years-
Weather and structures5<1%7% 0 a day, more than 3 of the other 4 years-
Autumn7210%7% 3 a day, more than 3 of the other 4 years-
External111%4% 0 a day, the least in 5 years-
Network management25835%17% 9 a day, more than 1 of the other 4 years-
The operators' causes
Train faults7710%16% 3 a day, more than 1 of the other 4 years7
Traincrew537%11% 2 a day, more than 2 of the other 4 years-
Stations223%3% 1 a day, more than 3 of the other 4 years-
Operations162%5% 1 a day, the least in 5 years-
Operator, other17323%7% 6 a day, more than 2 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)122
VHPassenger Communication cord, door egress or emergency train alarm operated86
Q3NZ Pumps T72
TTLeaf fall Neutral62
OCSignaller including mis-routing (not ERTM /ETCS related)60
TGDriver45
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)28
M0Confirmed train cab based safety system fault (including GSMR)24
OBDelayed by signaller not applying applicable regulating policy19
IRBroken/cracked/twisted/buckled/flawed rail18
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)8,407
OCSignaller including mis-routing (not ERTM /ETCS related)4,682
IRBroken/cracked/twisted/buckled/flawed rail3,732
ICTrack circuit failure (including no fault found)3,258
IBPoints failure (including no fault found)2,570
TGDriver2,547
VHPassenger Communication cord, door egress or emergency train alarm operated2,044
XPBRIDGE HIT1,775
OBDelayed by signaller not applying applicable regulating policy1,428
JHCritical Rail Temperature speeds, (other than buckled rails)1,416