Leaves on the Line

Grays

GRY Anglia route
CSV JSON

294 delay minutes

The biggest share (27%) of the delay picked up at Grays in the four weeks to 9 December 2023 came from how the network was run.

85% of these minutes were knock-on from something that happened elsewhere first. 93% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3512%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power2810%16% 1 a day, more than 1 of the other 4 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn2<1%7% 0 a day, more than 3 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management7827%17% 3 a day, the most in 5 years1
The operators' causes
Train faults5117%16% 2 a day, more than 3 of the other 4 years-
Traincrew6723%11% 2 a day, the most in 5 years2
Stations2<1%3% 0 a day, the least in 5 years-
Operations165%5% 1 a day, more than 1 of the other 4 years-
Operator, other165%7% 1 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.35
TGDriver31
TWDriver adhering to company professional driving standards or policy24
I6Delays as a result of line blocks / track patrols (including late handback)20
M8Technical failures above the Solebar20
MUDepot operating problem16
IBPoints failure (including no fault found)10
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles10
OCSignaller including mis-routing (not ERTM /ETCS related)10
FXFreight train running at lower class or speed than planned classification or overweight9
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,338
JFOff track asset defects or issues on the NR network (not due to vandalism or weather or part of station infrastructure)1,976
TGDriver1,157
IRBroken/cracked/twisted/buckled/flawed rail943
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure805
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail795
VHPassenger Communication cord, door egress or emergency train alarm operated703
OCSignaller including mis-routing (not ERTM /ETCS related)695
XRCable vandalism or theft660
OHARS / TMS / SARS software problem (excluding scheduling issues and technical failures)631