Gunnislake
86 delay minutes
The biggest share (34%) of the delay picked up at Gunnislake in the four weeks to 9 December 2023 came from traincrew problems.
91% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 9 | 10% | 8% | 0 a day, the most in 5 years | - |
| Signals, points and power | 10 | 12% | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | 10 | 12% | 7% | 0 a day, more than 2 of the other 4 years | - |
| Autumn | 10 | 11% | 7% | 0 a day, more than 1 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 9 | 10% | 17% | 0 a day, the least in 5 years | - |
| The operators' causes | |||||
| Train faults | - | - | 16% | 0 a day, the least in 5 years | - |
| Traincrew | 29 | 34% | 11% | 1 a day, more than 3 of the other 4 years | 6 |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | - | - | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 10 | 11% | 7% | 0 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 29 |
| IA | Signal failure (including no fault found) | 10 |
| Q3 | NZ Pumps T | 10 |
| TT | Leaf fall Neutral | 10 |
| JK | Flooding not due to exceptional weather | 7 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5 |
| ZU | No Cause Identified After investigation by both Parties | 5 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 4 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 4 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,353 |
| MD | Technical failures below the solebar | 642 |
| M8 | Technical failures above the Solebar | 413 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 411 |
| M7 | Door and Door system faults | 392 |
| TH | (Senior) Conductor/Train Manager | 312 |
| ZU | No Cause Identified After investigation by both Parties | 309 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 256 |
| ZY | Univestigated station overtime System Roll-up Only | 237 |
| MU | Depot operating problem | 194 |