The biggest share (19%) of the delay picked up at Guiseley in the four weeks to 9 December 2023 came from traincrew problems.

66% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1388%8% 5 a day, the most in 5 years1
Signals, points and power372%16% 1 a day, more than 1 of the other 4 years1
Weather and structures905%7% 3 a day, more than 3 of the other 4 years-
Autumn29518%7% 11 a day, more than 1 of the other 4 years-
External1117%4% 4 a day, the most in 5 years3
Network management20512%17% 7 a day, more than 3 of the other 4 years1
The operators' causes
Train faults1137%16% 4 a day, more than 1 of the other 4 years2
Traincrew31619%11% 11 a day, the most in 5 years-
Stations282%3% 1 a day, more than 1 of the other 4 years-
Operations382%5% 1 a day, more than 1 of the other 4 years-
Operator, other29518%7% 11 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T270
TTLeaf fall Neutral249
TGDriver148
TH(Senior) Conductor/Train Manager119
IRBroken/cracked/twisted/buckled/flawed rail94
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)92
OUDelays not Investigated by Network Rail59
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail49
MUDepot operating problem44
T3Waiting connections from other transport modes44
Since 2018
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T3,667
TGDriver3,267
TTLeaf fall Neutral3,118
MDTechnical failures below the solebar2,483
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,695
MNBrake and brake systems faults; including wheel flats where no other cause had been identified1,638
Q1Takeback Pumps1,597
RBPassengers joining/alighting1,565
RCre-booked assistance for a person with reduced mobility joining/alighting,1,505
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps1,497