Leaves on the Line

Guide Bridge

GUI North West route
CSV JSON

0 delay minutes

No delay was picked up at Guide Bridge in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%1
The operators' causes
Train faults--16%1
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 5 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
XMExternal utility incident including gas, water mains, overhead power lines221
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure80
T8Delays at Station believed to be operator cause and Information required from operator (Ops responsibility)31
JKFlooding not due to exceptional weather29
T3Waiting connections from other transport modes18
RZOther Station Operating causes14
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)13
I1Overhead line/third rail defect13
M1Confirmed Pantograph ADD, associated system faults, positive PANCHEX activations and train borne power switch over systems (AC)10
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure10