Leaves on the Line

Gunnersbury

GUN Anglia route
CSV JSON

301 delay minutes

The biggest share (24%) of the delay picked up at Gunnersbury in the four weeks to 9 December 2023 came from the operators' own operations.

71% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track217%8% 1 a day, the most in 5 years-
Signals, points and power4114%16% 1 a day, more than 3 of the other 4 years-
Weather and structures41%7% 0 a day, more than 3 of the other 4 years-
Autumn--7% 0 a day, the least in 5 years-
External186%4% 1 a day, the most in 5 years-
Network management5117%17% 2 a day, the most in 5 years-
The operators' causes
Train faults4214%16% 2 a day, more than 3 of the other 4 years-
Traincrew3110%11% 1 a day, more than 2 of the other 4 years-
Stations114%3% 0 a day, more than 2 of the other 4 years-
Operations7224%5% 3 a day, the most in 5 years-
Operator, other103%7% 0 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)31
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)25
OCSignaller including mis-routing (not ERTM /ETCS related)19
MCDiesel Loco failure, defect, attention17
M0Confirmed train cab based safety system fault (including GSMR)16
TGDriver16
ITRough ride or bumps reported - cause not known or no fault found15
J0Telecom equipment radio failure (GSM-R)15
RBPassengers joining/alighting11
ORLOM directive or Signaller correctly applying local instructions (ex late running trains or infrastructure Accepted Limitation)10
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver1,579
TXDelays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays)1,401
ICTrack circuit failure (including no fault found)1,150
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.918
OCSignaller including mis-routing (not ERTM /ETCS related)761
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure611
IBPoints failure (including no fault found)544
IASignal failure (including no fault found)445
MDTechnical failures below the solebar442
RBPassengers joining/alighting437