Gunnersbury
301 delay minutes
The biggest share (24%) of the delay picked up at Gunnersbury in the four weeks to 9 December 2023 came from the operators' own operations.
71% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 21 | 7% | 8% | 1 a day, the most in 5 years | - |
| Signals, points and power | 41 | 14% | 16% | 1 a day, more than 3 of the other 4 years | - |
| Weather and structures | 4 | 1% | 7% | 0 a day, more than 3 of the other 4 years | - |
| Autumn | - | - | 7% | 0 a day, the least in 5 years | - |
| External | 18 | 6% | 4% | 1 a day, the most in 5 years | - |
| Network management | 51 | 17% | 17% | 2 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 42 | 14% | 16% | 2 a day, more than 3 of the other 4 years | - |
| Traincrew | 31 | 10% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | 11 | 4% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 72 | 24% | 5% | 3 a day, the most in 5 years | - |
| Operator, other | 10 | 3% | 7% | 0 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 31 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 25 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 19 |
| MC | Diesel Loco failure, defect, attention | 17 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 16 |
| TG | Driver | 16 |
| IT | Rough ride or bumps reported - cause not known or no fault found | 15 |
| J0 | Telecom equipment radio failure (GSM-R) | 15 |
| RB | Passengers joining/alighting | 11 |
| OR | LOM directive or Signaller correctly applying local instructions (ex late running trains or infrastructure Accepted Limitation) | 10 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 1,579 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 1,401 |
| IC | Track circuit failure (including no fault found) | 1,150 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 918 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 761 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 611 |
| IB | Points failure (including no fault found) | 544 |
| IA | Signal failure (including no fault found) | 445 |
| MD | Technical failures below the solebar | 442 |
| RB | Passengers joining/alighting | 437 |