1,067 delay minutes
The biggest share (33%) of the delay picked up at Hackney Downs in the four weeks to 9 December 2023 came from how the network was run.
72% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 72 | 7% | 8% | 3 a day, the least in 5 years | - |
| Signals, points and power | 118 | 11% | 16% | 4 a day, more than 2 of the other 4 years | 1 |
| Weather and structures | 17 | 2% | 7% | 1 a day, more than 2 of the other 4 years | - |
| Autumn | 22 | 2% | 7% | 1 a day, more than 2 of the other 4 years | - |
| External | 232 | 22% | 4% | 8 a day, the most in 5 years | 2 |
| Network management | 354 | 33% | 17% | 13 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 82 | 8% | 16% | 3 a day, more than 1 of the other 4 years | - |
| Traincrew | 19 | 2% | 11% | 1 a day, more than 1 of the other 4 years | - |
| Stations | 24 | 2% | 3% | 1 a day, the least in 5 years | - |
| Operations | 90 | 8% | 5% | 3 a day, more than 3 of the other 4 years | - |
| Operator, other | 39 | 4% | 7% | 1 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XP | BRIDGE HIT | 229 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 206 |
| I2 | AC/DC trip (including no fault or cause found) | 86 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 80 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 69 |
| J9 | Preventative Maintenance to the infrastructure in response to a Remote Condition Monitoring Alert | 41 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 28 |
| M7 | Door and Door system faults | 24 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 22 |
| IC | Track circuit failure (including no fault found) | 21 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 10,862 |
| IB | Points failure (including no fault found) | 4,538 |
| TG | Driver | 4,309 |
| MD | Technical failures below the solebar | 4,046 |
| RB | Passengers joining/alighting | 3,635 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 2,987 |
| M7 | Door and Door system faults | 2,583 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 2,564 |
| IC | Track circuit failure (including no fault found) | 2,508 |
| I1 | Overhead line/third rail defect | 2,426 |