Heathrow Terminal 4
2,188 delay minutes
The biggest share (43%) of the delay picked up at Heathrow Terminal 4 in the four weeks to 9 December 2023 came from faulty trains.
86% of these minutes were knock-on from something that happened elsewhere first. 59% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 381 | 17% | 8% | 14 a day, the most in 5 years | 2 |
| Signals, points and power | 81 | 4% | 16% | 3 a day, the most in 5 years | 23 |
| Weather and structures | 14 | <1% | 7% | 1 a day, the most in 5 years | - |
| Autumn | 7 | <1% | 7% | 0 a day, the most in 5 years | - |
| External | 12 | <1% | 4% | 0 a day, the most in 5 years | - |
| Network management | 238 | 11% | 17% | 9 a day, the most in 5 years | 11 |
| The operators' causes | |||||
| Train faults | 949 | 43% | 16% | 34 a day, the most in 5 years | 17 |
| Traincrew | 153 | 7% | 11% | 5 a day, the most in 5 years | - |
| Stations | 10 | <1% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | 225 | 10% | 5% | 8 a day, the most in 5 years | 7 |
| Operator, other | 119 | 5% | 7% | 4 a day, the most in 5 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| M2 | Delay due to ATO / ETCS equipment | 703 |
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 220 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 216 |
| TG | Driver | 145 |
| OU | Delays not Investigated by Network Rail | 141 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 139 |
| M7 | Door and Door system faults | 97 |
| I1 | Overhead line/third rail defect | 48 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 43 |
| MU | Depot operating problem | 41 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TX | Delays incurred on non-Network Rail running lines or networks including London Underground (except fleet related delays) | 3,163 |
| M2 | Delay due to ATO / ETCS equipment | 2,426 |
| TG | Driver | 1,149 |
| IB | Points failure (including no fault found) | 830 |
| M8 | Technical failures above the Solebar | 750 |
| J3 | Axle Counter Failure | 745 |
| I1 | Overhead line/third rail defect | 674 |
| M7 | Door and Door system faults | 660 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 621 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 577 |