Havant
1,545 delay minutes
The biggest share (28%) of the delay picked up at Havant in the four weeks to 9 December 2023 came from signal, points and power faults.
76% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 111 | 7% | 8% | 4 a day, more than 2 of the other 4 years | 3 |
| Signals, points and power | 436 | 28% | 16% | 16 a day, more than 1 of the other 4 years | 12 |
| Weather and structures | 58 | 4% | 7% | 2 a day, more than 3 of the other 4 years | - |
| Autumn | 96 | 6% | 7% | 3 a day, more than 1 of the other 4 years | - |
| External | 91 | 6% | 4% | 3 a day, the most in 5 years | 3 |
| Network management | 194 | 13% | 17% | 7 a day, the least in 5 years | 2 |
| The operators' causes | |||||
| Train faults | 244 | 16% | 16% | 9 a day, the most in 5 years | 3 |
| Traincrew | 144 | 9% | 11% | 5 a day, more than 1 of the other 4 years | 6 |
| Stations | 40 | 3% | 3% | 1 a day, the least in 5 years | - |
| Operations | 33 | 2% | 5% | 1 a day, more than 3 of the other 4 years | 1 |
| Operator, other | 99 | 6% | 7% | 4 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| II | Signalling lineside cable fault | 209 |
| IB | Points failure (including no fault found) | 95 |
| Q3 | NZ Pumps T | 83 |
| TT | Leaf fall Neutral | 83 |
| TG | Driver | 64 |
| TH | (Senior) Conductor/Train Manager | 64 |
| MY | Coupler, Coupler system and Jumper cable faults | 57 |
| XK | National Grid Power Failure - local area also affected (inc outage, surges, blips where working standby generator/UPS installed) | 56 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 54 |
| MC | Diesel Loco failure, defect, attention | 54 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| II | Signalling lineside cable fault | 13,578 |
| TG | Driver | 6,729 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5,563 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 4,475 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 4,095 |
| MD | Technical failures below the solebar | 2,773 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 2,700 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 2,470 |
| IC | Track circuit failure (including no fault found) | 2,317 |
| IA | Signal failure (including no fault found) | 2,151 |