2,211 delay minutes

The biggest share (26%) of the delay picked up at Hazel Grove in the four weeks to 9 December 2023 came from how the network was run.

86% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track23511%8% 8 a day, the most in 5 years-
Signals, points and power36617%16% 13 a day, the most in 5 years1
Weather and structures653%7% 2 a day, more than 2 of the other 4 years-
Autumn1246%7% 4 a day, more than 1 of the other 4 years-
External854%4% 3 a day, more than 2 of the other 4 years-
Network management56926%17% 20 a day, the most in 5 years4
The operators' causes
Train faults27713%16% 10 a day, the least in 5 years4
Traincrew23110%11% 8 a day, the most in 5 years1
Stations733%3% 3 a day, more than 3 of the other 4 years-
Operations683%5% 2 a day, more than 2 of the other 4 years-
Operator, other1215%7% 4 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.196
OMTechnical failure associated with a Railhead conditioning train142
TGDriver141
OUDelays not Investigated by Network Rail108
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure87
IBPoints failure (including no fault found)77
OCSignaller including mis-routing (not ERTM /ETCS related)77
TH(Senior) Conductor/Train Manager73
XPBRIDGE HIT68
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)63
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver4,413
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,839
MDTechnical failures below the solebar3,559
IASignal failure (including no fault found)2,432
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,363
IBPoints failure (including no fault found)2,337
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure2,057
M8Technical failures above the Solebar1,944
M7Door and Door system faults1,826
MNBrake and brake systems faults; including wheel flats where no other cause had been identified1,795