489 delay minutes

The biggest share (27%) of the delay picked up at Headcorn in the four weeks to 9 December 2023 came from how the network was run.

54% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power6112%16% 2 a day, more than 3 of the other 4 years-
Weather and structures5812%7% 2 a day, the most in 5 years-
Autumn5611%7% 2 a day, more than 3 of the other 4 years-
External3<1%4% 0 a day, the least in 5 years-
Network management13127%17% 5 a day, the most in 5 years-
The operators' causes
Train faults245%16% 1 a day, the least in 5 years-
Traincrew367%11% 1 a day, more than 3 of the other 4 years-
Stations112%3% 0 a day, more than 3 of the other 4 years-
Operations265%5% 1 a day, the most in 5 years-
Operator, other8417%7% 3 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OGIce on conductor rail/OHLE58
Q3NZ Pumps T56
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)55
TTLeaf fall Neutral50
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure26
TGDriver22
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)17
QMTrain schedule/STP Process including erroneous simplifiers17
IKTelecom equipment failure (including no fault found)15
FWLate start/yard overtime not explained by Operator14
Since 2018
CodeWhat Network Rail loggedMinutes
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,225
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)1,024
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure862
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions842
IHPower Supply And Distribution System Failure730
TGDriver678
ICTrack circuit failure (including no fault found)523
IBPoints failure (including no fault found)468
TTLeaf fall Neutral412
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards385