Headcorn
489 delay minutes
The biggest share (27%) of the delay picked up at Headcorn in the four weeks to 9 December 2023 came from how the network was run.
54% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 61 | 12% | 16% | 2 a day, more than 3 of the other 4 years | - |
| Weather and structures | 58 | 12% | 7% | 2 a day, the most in 5 years | - |
| Autumn | 56 | 11% | 7% | 2 a day, more than 3 of the other 4 years | - |
| External | 3 | <1% | 4% | 0 a day, the least in 5 years | - |
| Network management | 131 | 27% | 17% | 5 a day, the most in 5 years | - |
| The operators' causes | |||||
| Train faults | 24 | 5% | 16% | 1 a day, the least in 5 years | - |
| Traincrew | 36 | 7% | 11% | 1 a day, more than 3 of the other 4 years | - |
| Stations | 11 | 2% | 3% | 0 a day, more than 3 of the other 4 years | - |
| Operations | 26 | 5% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 84 | 17% | 7% | 3 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OG | Ice on conductor rail/OHLE | 58 |
| Q3 | NZ Pumps T | 56 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 55 |
| TT | Leaf fall Neutral | 50 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 26 |
| TG | Driver | 22 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 17 |
| QM | Train schedule/STP Process including erroneous simplifiers | 17 |
| IK | Telecom equipment failure (including no fault found) | 15 |
| FW | Late start/yard overtime not explained by Operator | 14 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,225 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 1,024 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 862 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 842 |
| IH | Power Supply And Distribution System Failure | 730 |
| TG | Driver | 678 |
| IC | Track circuit failure (including no fault found) | 523 |
| IB | Points failure (including no fault found) | 468 |
| TT | Leaf fall Neutral | 412 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 385 |