Leaves on the Line

Hadfield

HDF North West route
CSV JSON

2,083 delay minutes

The biggest share (24%) of the delay picked up at Hadfield in the four weeks to 9 December 2023 came from autumn leaves.

70% of these minutes were knock-on from something that happened elsewhere first. 66% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track231%8% 1 a day, more than 3 of the other 4 years-
Signals, points and power26213%16% 9 a day, the most in 5 years1
Weather and structures1407%7% 5 a day, the most in 5 years1
Autumn50524%7% 18 a day, more than 2 of the other 4 years-
External--4% 0 a day, the least in 5 years-
Network management36317%17% 13 a day, the most in 5 years4
The operators' causes
Train faults914%16% 3 a day, more than 2 of the other 4 years8
Traincrew1035%11% 4 a day, more than 2 of the other 4 years15
Stations603%3% 2 a day, more than 2 of the other 4 years-
Operations412%5% 1 a day, more than 1 of the other 4 years-
Operator, other49624%7% 18 a day, more than 3 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T437
TTLeaf fall Neutral437
OUDelays not Investigated by Network Rail135
ICTrack circuit failure (including no fault found)107
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure104
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail81
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards74
I5Possession over-run from planned work71
QICautioning due to railhead leaf contamination58
JKFlooding not due to exceptional weather56
Since 2018
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T5,693
TTLeaf fall Neutral5,011
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)4,558
TGDriver3,345
MDTechnical failures below the solebar2,280
ICTrack circuit failure (including no fault found)2,089
RBPassengers joining/alighting2,053
RCre-booked assistance for a person with reduced mobility joining/alighting,1,883
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)1,397
M7Door and Door system faults1,175