Hadfield
2,083 delay minutes
The biggest share (24%) of the delay picked up at Hadfield in the four weeks to 9 December 2023 came from autumn leaves.
70% of these minutes were knock-on from something that happened elsewhere first. 66% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 23 | 1% | 8% | 1 a day, more than 3 of the other 4 years | - |
| Signals, points and power | 262 | 13% | 16% | 9 a day, the most in 5 years | 1 |
| Weather and structures | 140 | 7% | 7% | 5 a day, the most in 5 years | 1 |
| Autumn | 505 | 24% | 7% | 18 a day, more than 2 of the other 4 years | - |
| External | - | - | 4% | 0 a day, the least in 5 years | - |
| Network management | 363 | 17% | 17% | 13 a day, the most in 5 years | 4 |
| The operators' causes | |||||
| Train faults | 91 | 4% | 16% | 3 a day, more than 2 of the other 4 years | 8 |
| Traincrew | 103 | 5% | 11% | 4 a day, more than 2 of the other 4 years | 15 |
| Stations | 60 | 3% | 3% | 2 a day, more than 2 of the other 4 years | - |
| Operations | 41 | 2% | 5% | 1 a day, more than 1 of the other 4 years | - |
| Operator, other | 496 | 24% | 7% | 18 a day, more than 3 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 437 |
| TT | Leaf fall Neutral | 437 |
| OU | Delays not Investigated by Network Rail | 135 |
| IC | Track circuit failure (including no fault found) | 107 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 104 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 81 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 74 |
| I5 | Possession over-run from planned work | 71 |
| QI | Cautioning due to railhead leaf contamination | 58 |
| JK | Flooding not due to exceptional weather | 56 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 5,693 |
| TT | Leaf fall Neutral | 5,011 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 4,558 |
| TG | Driver | 3,345 |
| MD | Technical failures below the solebar | 2,280 |
| IC | Track circuit failure (including no fault found) | 2,089 |
| RB | Passengers joining/alighting | 2,053 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 1,883 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,397 |
| M7 | Door and Door system faults | 1,175 |