Heald Green
2,144 delay minutes
The biggest share (15%) of the delay picked up at Heald Green in the four weeks to 9 December 2023 came from faulty trains.
82% of these minutes were knock-on from something that happened elsewhere first. 86% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 61 | 3% | 8% | 2 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 256 | 12% | 16% | 9 a day, more than 2 of the other 4 years | - |
| Weather and structures | 153 | 7% | 7% | 5 a day, the most in 5 years | - |
| Autumn | 277 | 13% | 7% | 10 a day, more than 3 of the other 4 years | - |
| External | 65 | 3% | 4% | 2 a day, the most in 5 years | - |
| Network management | 253 | 12% | 17% | 9 a day, more than 2 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 318 | 15% | 16% | 11 a day, more than 1 of the other 4 years | - |
| Traincrew | 278 | 13% | 11% | 10 a day, more than 3 of the other 4 years | - |
| Stations | 131 | 6% | 3% | 5 a day, more than 3 of the other 4 years | - |
| Operations | 85 | 4% | 5% | 3 a day, more than 1 of the other 4 years | - |
| Operator, other | 269 | 13% | 7% | 10 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 223 |
| TT | Leaf fall Neutral | 200 |
| TG | Driver | 163 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 118 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 94 |
| MD | Technical failures below the solebar | 73 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 72 |
| TH | (Senior) Conductor/Train Manager | 66 |
| OU | Delays not Investigated by Network Rail | 60 |
| IB | Points failure (including no fault found) | 51 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 6,876 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 6,062 |
| MD | Technical failures below the solebar | 4,161 |
| M8 | Technical failures above the Solebar | 3,038 |
| IB | Points failure (including no fault found) | 2,987 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 2,831 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,494 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 2,434 |
| M7 | Door and Door system faults | 2,376 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 2,322 |