Leaves on the Line

Heald Green

HDG North West route
CSV JSON

2,144 delay minutes

The biggest share (15%) of the delay picked up at Heald Green in the four weeks to 9 December 2023 came from faulty trains.

82% of these minutes were knock-on from something that happened elsewhere first. 86% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track613%8% 2 a day, more than 2 of the other 4 years-
Signals, points and power25612%16% 9 a day, more than 2 of the other 4 years-
Weather and structures1537%7% 5 a day, the most in 5 years-
Autumn27713%7% 10 a day, more than 3 of the other 4 years-
External653%4% 2 a day, the most in 5 years-
Network management25312%17% 9 a day, more than 2 of the other 4 years-
The operators' causes
Train faults31815%16% 11 a day, more than 1 of the other 4 years-
Traincrew27813%11% 10 a day, more than 3 of the other 4 years-
Stations1316%3% 5 a day, more than 3 of the other 4 years-
Operations854%5% 3 a day, more than 1 of the other 4 years-
Operator, other26913%7% 10 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T223
TTLeaf fall Neutral200
TGDriver163
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure118
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)94
MDTechnical failures below the solebar73
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail72
TH(Senior) Conductor/Train Manager66
OUDelays not Investigated by Network Rail60
IBPoints failure (including no fault found)51
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver6,876
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)6,062
MDTechnical failures below the solebar4,161
M8Technical failures above the Solebar3,038
IBPoints failure (including no fault found)2,987
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps2,831
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.2,494
IRBroken/cracked/twisted/buckled/flawed rail2,434
M7Door and Door system faults2,376
RCre-booked assistance for a person with reduced mobility joining/alighting,2,322