Hensall
16 delay minutes
The biggest share (31%) of the delay picked up at Hensall in the four weeks to 9 December 2023 came from weather and structures.
19% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | 5 | 31% | 7% | - |
| Autumn | 2 | 9% | 7% | - |
| External | - | - | 4% | - |
| Network management | 5 | 31% | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | 3 | 19% | 5% | - |
| Operator, other | 2 | 9% | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| OU | Delays not Investigated by Network Rail | 5 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 5 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 3 |
| Q3 | NZ Pumps T | 2 |
| TT | Leaf fall Neutral | 2 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 154 |
| IB | Points failure (including no fault found) | 114 |
| IC | Track circuit failure (including no fault found) | 59 |
| Q3 | NZ Pumps T | 53 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 46 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 35 |
| TT | Leaf fall Neutral | 35 |
| QJ | Special working for leaf-fall track circuit operation | 35 |
| TZ | Other Passenger Train Operating Company causes | 34 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 33 |