Leaves on the Line

Hendon

HEN East Midlands route
CSV JSON

80 delay minutes

The biggest share (43%) of the delay picked up at Hendon in the four weeks to 9 December 2023 came from how the network was run.

46% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power2430%16%1
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management3443%17%3
The operators' causes
Train faults--16%-
Traincrew2228%11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)34
TGDriver22
I1Overhead line/third rail defect18
J3Axle Counter Failure6
Since 2018
CodeWhat Network Rail loggedMinutes
M8Technical failures above the Solebar404
TGDriver353
TITraincrew rostering problem212
XPBRIDGE HIT124
ICTrack circuit failure (including no fault found)118
IBPoints failure (including no fault found)110
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)95
IESignalling Functional Power Supply Failure95
MCDiesel Loco failure, defect, attention94
MDTechnical failures below the solebar94