929 delay minutes

The biggest share (24%) of the delay picked up at Hexham in the four weeks to 9 December 2023 came from faulty trains.

56% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power313%16% 1 a day, more than 2 of the other 4 years-
Weather and structures9310%7% 3 a day, the most in 5 years-
Autumn15016%7% 5 a day, more than 1 of the other 4 years-
External505%4% 2 a day, the most in 5 years-
Network management12213%17% 4 a day, the most in 5 years86
The operators' causes
Train faults22224%16% 8 a day, the most in 5 years1
Traincrew455%11% 2 a day, more than 3 of the other 4 years5
Stations718%3% 3 a day, more than 3 of the other 4 years-
Operations526%5% 2 a day, the most in 5 years1
Operator, other9510%7% 3 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T92
TTLeaf fall Neutral92
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail68
OUDelays not Investigated by Network Rail55
MWWeather - effect on T&RS equipment47
M0Confirmed train cab based safety system fault (including GSMR)44
TZOther Passenger Train Operating Company causes43
M8Technical failures above the Solebar42
TGDriver42
RCre-booked assistance for a person with reduced mobility joining/alighting,39
Since 2018
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T2,161
MDTechnical failures below the solebar1,961
TTLeaf fall Neutral1,906
TGDriver1,838
OTOps Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused)1,703
IASignal failure (including no fault found)1,535
RBPassengers joining/alighting1,206
IBPoints failure (including no fault found)1,080
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail747
MUDepot operating problem714