929 delay minutes
The biggest share (24%) of the delay picked up at Hexham in the four weeks to 9 December 2023 came from faulty trains.
56% of these minutes were knock-on from something that happened elsewhere first. 94% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 31 | 3% | 16% | 1 a day, more than 2 of the other 4 years | - |
| Weather and structures | 93 | 10% | 7% | 3 a day, the most in 5 years | - |
| Autumn | 150 | 16% | 7% | 5 a day, more than 1 of the other 4 years | - |
| External | 50 | 5% | 4% | 2 a day, the most in 5 years | - |
| Network management | 122 | 13% | 17% | 4 a day, the most in 5 years | 86 |
| The operators' causes | |||||
| Train faults | 222 | 24% | 16% | 8 a day, the most in 5 years | 1 |
| Traincrew | 45 | 5% | 11% | 2 a day, more than 3 of the other 4 years | 5 |
| Stations | 71 | 8% | 3% | 3 a day, more than 3 of the other 4 years | - |
| Operations | 52 | 6% | 5% | 2 a day, the most in 5 years | 1 |
| Operator, other | 95 | 10% | 7% | 3 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 92 |
| TT | Leaf fall Neutral | 92 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 68 |
| OU | Delays not Investigated by Network Rail | 55 |
| MW | Weather - effect on T&RS equipment | 47 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 44 |
| TZ | Other Passenger Train Operating Company causes | 43 |
| M8 | Technical failures above the Solebar | 42 |
| TG | Driver | 42 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 39 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 2,161 |
| MD | Technical failures below the solebar | 1,961 |
| TT | Leaf fall Neutral | 1,906 |
| TG | Driver | 1,838 |
| OT | Ops Safety TSR implemented for sighting issues relating to foot crossings, level crossings or signals (Not vegetation caused) | 1,703 |
| IA | Signal failure (including no fault found) | 1,535 |
| RB | Passengers joining/alighting | 1,206 |
| IB | Points failure (including no fault found) | 1,080 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 747 |
| MU | Depot operating problem | 714 |