Hertford East
583 delay minutes
The biggest share (22%) of the delay picked up at Hertford East in the four weeks to 9 December 2023 came from other operator causes.
82% of these minutes were knock-on from something that happened elsewhere first. 97% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 25 | 4% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 101 | 17% | 16% | 4 a day, more than 2 of the other 4 years | 1 |
| Weather and structures | 8 | 1% | 7% | 0 a day, more than 2 of the other 4 years | - |
| Autumn | 29 | 5% | 7% | 1 a day, more than 3 of the other 4 years | - |
| External | 49 | 8% | 4% | 2 a day, more than 2 of the other 4 years | 1 |
| Network management | 120 | 20% | 17% | 4 a day, more than 2 of the other 4 years | 5 |
| The operators' causes | |||||
| Train faults | 53 | 9% | 16% | 2 a day, the least in 5 years | - |
| Traincrew | 25 | 4% | 11% | 1 a day, more than 1 of the other 4 years | 1 |
| Stations | 14 | 2% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 29 | 5% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 131 | 22% | 7% | 5 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 125 |
| I2 | AC/DC trip (including no fault or cause found) | 91 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 50 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 37 |
| M7 | Door and Door system faults | 36 |
| TG | Driver | 22 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 20 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 18 |
| TZ | Other Passenger Train Operating Company causes | 17 |
| QH | Adhesion problems due to leaf contamination | 15 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,171 |
| TG | Driver | 2,341 |
| MD | Technical failures below the solebar | 2,077 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,997 |
| M8 | Technical failures above the Solebar | 1,596 |
| IB | Points failure (including no fault found) | 1,463 |
| M7 | Door and Door system faults | 1,430 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 1,207 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,109 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,001 |