Hastings
1,457 delay minutes
The biggest share (33%) of the delay picked up at Hastings in the four weeks to 9 December 2023 came from signal, points and power faults.
56% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 22 | 2% | 8% | 1 a day, more than 2 of the other 4 years | 2 |
| Signals, points and power | 479 | 33% | 16% | 17 a day, the most in 5 years | 10 |
| Weather and structures | 9 | <1% | 7% | 0 a day, more than 2 of the other 4 years | 2 |
| Autumn | 279 | 19% | 7% | 10 a day, the most in 5 years | 3 |
| External | 18 | 1% | 4% | 1 a day, more than 3 of the other 4 years | 3 |
| Network management | 282 | 19% | 17% | 10 a day, the most in 5 years | 65 |
| The operators' causes | |||||
| Train faults | 64 | 4% | 16% | 2 a day, more than 1 of the other 4 years | 15 |
| Traincrew | 124 | 9% | 11% | 4 a day, more than 3 of the other 4 years | 6 |
| Stations | 7 | <1% | 3% | 0 a day, more than 2 of the other 4 years | - |
| Operations | 31 | 2% | 5% | 1 a day, more than 1 of the other 4 years | 3 |
| Operator, other | 143 | 10% | 7% | 5 a day, more than 3 of the other 4 years | 1 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IG | Block failure | 372 |
| QI | Cautioning due to railhead leaf contamination | 234 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 87 |
| TG | Driver | 71 |
| OD | Delays due to National/Regional/Route Operations directives or Route Control decision or directive | 62 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 55 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 51 |
| M8 | Technical failures above the Solebar | 51 |
| Q3 | NZ Pumps T | 45 |
| TT | Leaf fall Neutral | 45 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 3,978 |
| IC | Track circuit failure (including no fault found) | 2,752 |
| IB | Points failure (including no fault found) | 2,481 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,196 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 2,180 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 1,689 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 1,644 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,331 |
| MD | Technical failures below the solebar | 1,311 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 1,219 |