1,933 delay minutes

The biggest share (24%) of the delay picked up at Harrogate in the four weeks to 9 December 2023 came from autumn leaves.

36% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track14<1%8% 1 a day, the least in 5 years-
Signals, points and power382%16% 1 a day, more than 2 of the other 4 years3
Weather and structures40621%7% 15 a day, the most in 5 years20
Autumn45924%7% 16 a day, more than 2 of the other 4 years-
External231%4% 1 a day, more than 3 of the other 4 years-
Network management30316%17% 11 a day, the most in 5 years19
The operators' causes
Train faults1307%16% 5 a day, more than 3 of the other 4 years6
Traincrew1337%11% 5 a day, more than 3 of the other 4 years24
Stations18<1%3% 1 a day, more than 1 of the other 4 years-
Operations9<1%5% 0 a day, the least in 5 years-
Operator, other40021%7% 14 a day, more than 2 of the other 4 years2

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T383
TTLeaf fall Neutral374
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail228
OMTechnical failure associated with a Railhead conditioning train115
OUDelays not Investigated by Network Rail102
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure94
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions67
TH(Senior) Conductor/Train Manager58
TGDriver51
OSLate start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident47
Since 2018
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T4,238
TTLeaf fall Neutral3,593
MDTechnical failures below the solebar2,755
TGDriver2,628
JSCondition of Track TSR outside the Timetable Planning Rules2,297
OCSignaller including mis-routing (not ERTM /ETCS related)1,547
RBPassengers joining/alighting1,438
TH(Senior) Conductor/Train Manager1,293
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)1,285
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,247