Harrogate
1,933 delay minutes
The biggest share (24%) of the delay picked up at Harrogate in the four weeks to 9 December 2023 came from autumn leaves.
36% of these minutes were knock-on from something that happened elsewhere first. 90% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 14 | <1% | 8% | 1 a day, the least in 5 years | - |
| Signals, points and power | 38 | 2% | 16% | 1 a day, more than 2 of the other 4 years | 3 |
| Weather and structures | 406 | 21% | 7% | 15 a day, the most in 5 years | 20 |
| Autumn | 459 | 24% | 7% | 16 a day, more than 2 of the other 4 years | - |
| External | 23 | 1% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 303 | 16% | 17% | 11 a day, the most in 5 years | 19 |
| The operators' causes | |||||
| Train faults | 130 | 7% | 16% | 5 a day, more than 3 of the other 4 years | 6 |
| Traincrew | 133 | 7% | 11% | 5 a day, more than 3 of the other 4 years | 24 |
| Stations | 18 | <1% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 9 | <1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 400 | 21% | 7% | 14 a day, more than 2 of the other 4 years | 2 |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 383 |
| TT | Leaf fall Neutral | 374 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 228 |
| OM | Technical failure associated with a Railhead conditioning train | 115 |
| OU | Delays not Investigated by Network Rail | 102 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 94 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 67 |
| TH | (Senior) Conductor/Train Manager | 58 |
| TG | Driver | 51 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 47 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 4,238 |
| TT | Leaf fall Neutral | 3,593 |
| MD | Technical failures below the solebar | 2,755 |
| TG | Driver | 2,628 |
| JS | Condition of Track TSR outside the Timetable Planning Rules | 2,297 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,547 |
| RB | Passengers joining/alighting | 1,438 |
| TH | (Senior) Conductor/Train Manager | 1,293 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 1,285 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,247 |