157 delay minutes
The biggest share (43%) of the delay picked up at Highbridge & Burnham-on-Sea in the four weeks to 9 December 2023 came from signal, points and power faults.
41% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 67 | 43% | 16% | 2 a day, the most in 5 years | - |
| Weather and structures | 10 | 6% | 7% | 0 a day, more than 3 of the other 4 years | - |
| Autumn | 12 | 8% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | 4 | 3% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 22 | 14% | 17% | 1 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 8 | 5% | 16% | 0 a day, the least in 5 years | - |
| Traincrew | 14 | 9% | 11% | 1 a day, the most in 5 years | - |
| Stations | 5 | 3% | 3% | 0 a day, the least in 5 years | - |
| Operations | 14 | 9% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | 1 | <1% | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 58 |
| QH | Adhesion problems due to leaf contamination | 11 |
| TG | Driver | 10 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 10 |
| ZU | No Cause Identified After investigation by both Parties | 9 |
| TC | Delays from Traincrew/loco/stock/unit diagrams issues resulting from an agreed mitigation resource plan, at 22:00 the day prior | 8 |
| J5 | Infrastructure Asset fault reported but proven to be mistaken | 7 |
| J3 | Axle Counter Failure | 6 |
| TZ | Other Passenger Train Operating Company causes | 6 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 5 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| RQ | Un-booked assistance for a person with reduced mobility joining/alighting, | 793 |
| RS | Loading or unloading un-reserved bicycles | 709 |
| MD | Technical failures below the solebar | 589 |
| IB | Points failure (including no fault found) | 552 |
| ZU | No Cause Identified After investigation by both Parties | 550 |
| RB | Passengers joining/alighting | 526 |
| TG | Driver | 503 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 459 |
| M8 | Technical failures above the Solebar | 362 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 315 |