157 delay minutes

The biggest share (43%) of the delay picked up at Highbridge & Burnham-on-Sea in the four weeks to 9 December 2023 came from signal, points and power faults.

41% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power6743%16% 2 a day, the most in 5 years-
Weather and structures106%7% 0 a day, more than 3 of the other 4 years-
Autumn128%7% 0 a day, more than 2 of the other 4 years-
External43%4% 0 a day, more than 1 of the other 4 years-
Network management2214%17% 1 a day, more than 3 of the other 4 years-
The operators' causes
Train faults85%16% 0 a day, the least in 5 years-
Traincrew149%11% 1 a day, the most in 5 years-
Stations53%3% 0 a day, the least in 5 years-
Operations149%5% 1 a day, the most in 5 years-
Operator, other1<1%7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)58
QHAdhesion problems due to leaf contamination11
TGDriver10
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure10
ZUNo Cause Identified After investigation by both Parties9
TCDelays from Traincrew/loco/stock/unit diagrams issues resulting from an agreed mitigation resource plan, at 22:00 the day prior8
J5Infrastructure Asset fault reported but proven to be mistaken7
J3Axle Counter Failure6
TZOther Passenger Train Operating Company causes6
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps5
Since 2018
CodeWhat Network Rail loggedMinutes
RQUn-booked assistance for a person with reduced mobility joining/alighting,793
RSLoading or unloading un-reserved bicycles709
MDTechnical failures below the solebar589
IBPoints failure (including no fault found)552
ZUNo Cause Identified After investigation by both Parties550
RBPassengers joining/alighting526
TGDriver503
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail459
M8Technical failures above the Solebar362
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps315