Leaves on the Line

Highbury & Islington

HII Anglia route
CSV JSON

0 delay minutes

No delay was picked up at Highbury & Islington in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%7
Signals, points and power--16%9
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%2
The operators' causes
Train faults--16%5
Traincrew--11%1
Stations--3%1
Operations--5%3
Operator, other--7%1

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 2 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
IBPoints failure (including no fault found)172
X8Animal Strike or incursion not within the control of Network Rail42
MNBrake and brake systems faults; including wheel flats where no other cause had been identified34
QMTrain schedule/STP Process including erroneous simplifiers32
TATrain-crew/loco/stock/unit diagram issues29
MCDiesel Loco failure, defect, attention26
IRBroken/cracked/twisted/buckled/flawed rail19
TZOther Passenger Train Operating Company causes17
J3Axle Counter Failure15
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)12