Leaves on the Line

Hillside

HIL North West route
CSV JSON

19 delay minutes

Most of the delay picked up at Hillside in the four weeks to 9 December 2023 came from how the network was run.

47% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management1474%17%133
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations526%5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)9
Q1Takeback Pumps5
TRTrain Operating Company Directive5
Since 2018
CodeWhat Network Rail loggedMinutes
MNBrake and brake systems faults; including wheel flats where no other cause had been identified37
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.23
MDTechnical failures below the solebar20
OKDelay caused by Operating staff oversight, issues or absence (excluding signallers and Control)12
XBVandalism or theft (including the placing of objects on the line)8
I9Fires starting on Network Rail Infrastructure8
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail7
Q1Takeback Pumps5
TRTrain Operating Company Directive5
MPRail / wheel interface, adhesion problems (including ice on the running rail)4