Hellifield
1,102 delay minutes
The biggest share (23%) of the delay picked up at Hellifield in the four weeks to 9 December 2023 came from weather and structures.
30% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 55 | 5% | 8% | 2 a day, the most in 5 years | - |
| Signals, points and power | 93 | 8% | 16% | 3 a day, more than 2 of the other 4 years | - |
| Weather and structures | 254 | 23% | 7% | 9 a day, the most in 5 years | 2 |
| Autumn | 155 | 14% | 7% | 6 a day, more than 3 of the other 4 years | - |
| External | 137 | 12% | 4% | 5 a day, the most in 5 years | - |
| Network management | 111 | 10% | 17% | 4 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 88 | 8% | 16% | 3 a day, more than 1 of the other 4 years | - |
| Traincrew | 18 | 2% | 11% | 1 a day, more than 2 of the other 4 years | - |
| Stations | 10 | <1% | 3% | 0 a day, the least in 5 years | - |
| Operations | 10 | <1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 172 | 16% | 7% | 6 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 185 |
| XP | BRIDGE HIT | 128 |
| Q3 | NZ Pumps T | 108 |
| TT | Leaf fall Neutral | 106 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 61 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 56 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 55 |
| JK | Flooding not due to exceptional weather | 50 |
| OA | Regulation Decision Made With Best Endeavours | 40 |
| MC | Diesel Loco failure, defect, attention | 29 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JS | Condition of Track TSR outside the Timetable Planning Rules | 2,024 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,802 |
| MD | Technical failures below the solebar | 1,363 |
| IB | Points failure (including no fault found) | 1,343 |
| IA | Signal failure (including no fault found) | 1,342 |
| Q3 | NZ Pumps T | 1,068 |
| IE | Signalling Functional Power Supply Failure | 1,042 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 831 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 816 |
| TG | Driver | 783 |