Leaves on the Line

Hellifield

HLD North West route
CSV JSON

1,102 delay minutes

The biggest share (23%) of the delay picked up at Hellifield in the four weeks to 9 December 2023 came from weather and structures.

30% of these minutes were knock-on from something that happened elsewhere first. 96% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track555%8% 2 a day, the most in 5 years-
Signals, points and power938%16% 3 a day, more than 2 of the other 4 years-
Weather and structures25423%7% 9 a day, the most in 5 years2
Autumn15514%7% 6 a day, more than 3 of the other 4 years-
External13712%4% 5 a day, the most in 5 years-
Network management11110%17% 4 a day, more than 3 of the other 4 years-
The operators' causes
Train faults888%16% 3 a day, more than 1 of the other 4 years-
Traincrew182%11% 1 a day, more than 2 of the other 4 years-
Stations10<1%3% 0 a day, the least in 5 years-
Operations10<1%5% 0 a day, the least in 5 years-
Operator, other17216%7% 6 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure185
XPBRIDGE HIT128
Q3NZ Pumps T108
TTLeaf fall Neutral106
MPRail / wheel interface, adhesion problems (including ice on the running rail)61
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure56
IRBroken/cracked/twisted/buckled/flawed rail55
JKFlooding not due to exceptional weather50
OARegulation Decision Made With Best Endeavours40
MCDiesel Loco failure, defect, attention29
Since 2018
CodeWhat Network Rail loggedMinutes
JSCondition of Track TSR outside the Timetable Planning Rules2,024
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,802
MDTechnical failures below the solebar1,363
IBPoints failure (including no fault found)1,343
IASignal failure (including no fault found)1,342
Q3NZ Pumps T1,068
IESignalling Functional Power Supply Failure1,042
I8Animal Strike or Incursion within the control of Network Rail831
MPRail / wheel interface, adhesion problems (including ice on the running rail)816
TGDriver783