Heath Low Level
0 delay minutes
No delay was picked up at Heath Low Level in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 89 |
| TG | Driver | 64 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 44 |
| M9 | Reported fleet equipment defect - no fault found | 36 |
| M7 | Door and Door system faults | 30 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 30 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 28 |
| XL | Fire external to but directly affecting the network (incl. line blocks for emergency services attending off network incidents) | 28 |
| T2 | Delay at unstaffed station to non-DOO train | 26 |
| MU | Depot operating problem | 19 |