3 delay minutes
Most of the delay picked up at Hilsea in the four weeks to 9 December 2023 came from track faults.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | 3 | 100% | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | 1 |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | 2 |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IR | Broken/cracked/twisted/buckled/flawed rail | 3 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IB | Points failure (including no fault found) | 93 |
| MU | Depot operating problem | 93 |
| II | Signalling lineside cable fault | 78 |
| I5 | Possession over-run from planned work | 69 |
| IA | Signal failure (including no fault found) | 63 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 43 |
| TA | Train-crew/loco/stock/unit diagram issues | 42 |
| I4 | OHLE/third rail power supply failure or reduction | 42 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 37 |
| OB | Delayed by signaller not applying applicable regulating policy | 32 |