Hemel Hempstead
63 delay minutes
The biggest share (41%) of the delay picked up at Hemel Hempstead in the four weeks to 9 December 2023 came from signal, points and power faults.
100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 26 | 41% | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | 2 | 3% | 4% | - |
| Network management | 20 | 32% | 17% | - |
| The operators' causes | ||||
| Train faults | 4 | 6% | 16% | - |
| Traincrew | 9 | 14% | 11% | 1 |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | 2 | 3% | 7% | 1 |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| II | Signalling lineside cable fault | 14 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 13 |
| ZU | No Cause Identified After investigation by both Parties | 7 |
| TI | Traincrew rostering problem | 6 |
| IB | Points failure (including no fault found) | 5 |
| IA | Signal failure (including no fault found) | 4 |
| M7 | Door and Door system faults | 4 |
| IH | Power Supply And Distribution System Failure | 3 |
| TG | Driver | 3 |
| FW | Late start/yard overtime not explained by Operator | 2 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 187 |
| IB | Points failure (including no fault found) | 135 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 121 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 107 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 98 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 72 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 64 |
| M7 | Door and Door system faults | 57 |
| I1 | Overhead line/third rail defect | 51 |
| OH | ARS / TMS / SARS software problem (excluding scheduling issues and technical failures) | 51 |