1,055 delay minutes

The biggest share (18%) of the delay picked up at Hammerton in the four weeks to 9 December 2023 came from how the network was run.

81% of these minutes were knock-on from something that happened elsewhere first. 89% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track141%8% 1 a day, the least in 5 years-
Signals, points and power10910%16% 4 a day, the most in 5 years-
Weather and structures707%7% 3 a day, the most in 5 years-
Autumn16115%7% 6 a day, more than 2 of the other 4 years-
External555%4% 2 a day, the most in 5 years-
Network management18718%17% 7 a day, more than 3 of the other 4 years-
The operators' causes
Train faults16416%16% 6 a day, more than 3 of the other 4 years-
Traincrew1009%11% 4 a day, more than 3 of the other 4 years-
Stations8<1%3% 0 a day, the least in 5 years-
Operations262%5% 1 a day, more than 1 of the other 4 years-
Operator, other16215%7% 6 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T130
TTLeaf fall Neutral122
OUDelays not Investigated by Network Rail105
M8Technical failures above the Solebar85
TGDriver57
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure46
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail42
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)41
TH(Senior) Conductor/Train Manager40
VHPassenger Communication cord, door egress or emergency train alarm operated29
Since 2018
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar1,876
TGDriver1,862
Q3NZ Pumps T1,514
IGBlock failure1,356
OCSignaller including mis-routing (not ERTM /ETCS related)1,323
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps1,290
IBPoints failure (including no fault found)1,265
TTLeaf fall Neutral1,163
IASignal failure (including no fault found)1,161
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,007