Leaves on the Line

Herne Bay

HNB Kent route
CSV JSON

4 delay minutes

Most of the delay picked up at Herne Bay in the four weeks to 9 December 2023 came from signal, points and power faults.

100% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power4100%16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)4
Since 2018
CodeWhat Network Rail loggedMinutes
T3Waiting connections from other transport modes197
RMWaiting connections from other transport modes37
TZOther Passenger Train Operating Company causes36
MDTechnical failures below the solebar36
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail33
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure28
I7Engineer's train late into, from or failed in possession26
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)22
M9Reported fleet equipment defect - no fault found20
VZOther passenger or external causes the responsibility of TOC18