438 delay minutes

The biggest share (35%) of the delay picked up at Hednesford in the four weeks to 9 December 2023 came from autumn leaves.

14% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power5011%16% 2 a day, more than 3 of the other 4 years1
Weather and structures358%7% 1 a day, more than 3 of the other 4 years-
Autumn15235%7% 5 a day, the most in 5 years1
External317%4% 1 a day, more than 3 of the other 4 years2
Network management317%17% 1 a day, more than 2 of the other 4 years1
The operators' causes
Train faults--16% 0 a day, the least in 5 years4
Traincrew327%11% 1 a day, more than 1 of the other 4 years3
Stations276%3% 1 a day, more than 2 of the other 4 years1
Operations--5% 0 a day, the least in 5 years-
Operator, other8018%7% 3 a day, more than 2 of the other 4 years1

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
QICautioning due to railhead leaf contamination94
Q3NZ Pumps T58
JKFlooding not due to exceptional weather35
MPRail / wheel interface, adhesion problems (including ice on the running rail)34
TTLeaf fall Neutral32
XPBRIDGE HIT31
TGDriver28
RQUn-booked assistance for a person with reduced mobility joining/alighting,27
ICTrack circuit failure (including no fault found)23
IBPoints failure (including no fault found)14
Since 2018
CodeWhat Network Rail loggedMinutes
JHCritical Rail Temperature speeds, (other than buckled rails)1,785
ICTrack circuit failure (including no fault found)1,713
TGDriver1,216
JDStructures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes)1,046
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards968
RQUn-booked assistance for a person with reduced mobility joining/alighting,882
TH(Senior) Conductor/Train Manager832
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.803
VHPassenger Communication cord, door egress or emergency train alarm operated462
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure448