Herne Hill
3,009 delay minutes
The biggest share (25%) of the delay picked up at Herne Hill in the four weeks to 9 December 2023 came from other operator causes.
76% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 107 | 4% | 8% | 4 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 332 | 11% | 16% | 12 a day, more than 3 of the other 4 years | 1 |
| Weather and structures | 36 | 1% | 7% | 1 a day, more than 2 of the other 4 years | - |
| Autumn | 521 | 17% | 7% | 19 a day, the most in 5 years | - |
| External | 15 | <1% | 4% | 1 a day, the least in 5 years | - |
| Network management | 621 | 21% | 17% | 22 a day, more than 2 of the other 4 years | 3 |
| The operators' causes | |||||
| Train faults | 299 | 10% | 16% | 11 a day, the most in 5 years | - |
| Traincrew | 264 | 9% | 11% | 9 a day, the most in 5 years | - |
| Stations | 63 | 2% | 3% | 2 a day, more than 3 of the other 4 years | - |
| Operations | 11 | <1% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 740 | 25% | 7% | 26 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 506 |
| TT | Leaf fall Neutral | 504 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 236 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 206 |
| TG | Driver | 203 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 87 |
| OK | Delay caused by Operating staff oversight, issues or absence (excluding signallers and Control) | 85 |
| IC | Track circuit failure (including no fault found) | 73 |
| I1 | Overhead line/third rail defect | 69 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 64 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 19,103 |
| TG | Driver | 10,015 |
| IC | Track circuit failure (including no fault found) | 7,705 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 5,256 |
| M8 | Technical failures above the Solebar | 5,056 |
| IB | Points failure (including no fault found) | 4,328 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 4,138 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 4,023 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 3,748 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 3,722 |