Hockley
181 delay minutes
The biggest share (24%) of the delay picked up at Hockley in the four weeks to 9 December 2023 came from how the network was run.
43% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | - | - | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | - | - | 16% | 0 a day, the least in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 5 | 2% | 7% | 0 a day, more than 2 of the other 4 years | - |
| External | 36 | 20% | 4% | 1 a day, the most in 5 years | - |
| Network management | 44 | 24% | 17% | 2 a day, the most in 5 years | 1 |
| The operators' causes | |||||
| Train faults | 43 | 24% | 16% | 2 a day, the most in 5 years | 1 |
| Traincrew | 13 | 7% | 11% | 0 a day, more than 2 of the other 4 years | - |
| Stations | 4 | 2% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 2 | 1% | 5% | 0 a day, more than 3 of the other 4 years | - |
| Operator, other | 35 | 19% | 7% | 1 a day, the most in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| XL | Fire external to but directly affecting the network (incl. line blocks for emergency services attending off network incidents) | 36 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 30 |
| I8 | Animal Strike or Incursion within the control of Network Rail | 29 |
| M7 | Door and Door system faults | 24 |
| TG | Driver | 13 |
| M8 | Technical failures above the Solebar | 10 |
| OB | Delayed by signaller not applying applicable regulating policy | 7 |
| I6 | Delays as a result of line blocks / track patrols (including late handback) | 6 |
| Q3 | NZ Pumps T | 5 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 4 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 16,531 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 12,875 |
| TG | Driver | 968 |
| M7 | Door and Door system faults | 566 |
| IB | Points failure (including no fault found) | 518 |
| MD | Technical failures below the solebar | 507 |
| IH | Power Supply And Distribution System Failure | 385 |
| I1 | Overhead line/third rail defect | 374 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 346 |
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 345 |