181 delay minutes

The biggest share (24%) of the delay picked up at Hockley in the four weeks to 9 December 2023 came from how the network was run.

43% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track--8% 0 a day, the least in 5 years-
Signals, points and power--16% 0 a day, the least in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn52%7% 0 a day, more than 2 of the other 4 years-
External3620%4% 1 a day, the most in 5 years-
Network management4424%17% 2 a day, the most in 5 years1
The operators' causes
Train faults4324%16% 2 a day, the most in 5 years1
Traincrew137%11% 0 a day, more than 2 of the other 4 years-
Stations42%3% 0 a day, more than 1 of the other 4 years-
Operations21%5% 0 a day, more than 3 of the other 4 years-
Operator, other3519%7% 1 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
XLFire external to but directly affecting the network (incl. line blocks for emergency services attending off network incidents)36
VHPassenger Communication cord, door egress or emergency train alarm operated30
I8Animal Strike or Incursion within the control of Network Rail29
M7Door and Door system faults24
TGDriver13
M8Technical failures above the Solebar10
OBDelayed by signaller not applying applicable regulating policy7
I6Delays as a result of line blocks / track patrols (including late handback)6
Q3NZ Pumps T5
M0Confirmed train cab based safety system fault (including GSMR)4
Since 2018
CodeWhat Network Rail loggedMinutes
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.16,531
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)12,875
TGDriver968
M7Door and Door system faults566
IBPoints failure (including no fault found)518
MDTechnical failures below the solebar507
IHPower Supply And Distribution System Failure385
I1Overhead line/third rail defect374
VHPassenger Communication cord, door egress or emergency train alarm operated346
JHCritical Rail Temperature speeds, (other than buckled rails)345