Honiton
1,825 delay minutes
The biggest share (34%) of the delay picked up at Honiton in the four weeks to 9 December 2023 came from signal, points and power faults.
73% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 221 | 12% | 8% | 8 a day, the most in 5 years | - |
| Signals, points and power | 626 | 34% | 16% | 22 a day, the most in 5 years | 2 |
| Weather and structures | 183 | 10% | 7% | 7 a day, more than 3 of the other 4 years | - |
| Autumn | 164 | 9% | 7% | 6 a day, the least in 5 years | - |
| External | 43 | 2% | 4% | 2 a day, more than 1 of the other 4 years | - |
| Network management | 246 | 13% | 17% | 9 a day, more than 2 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 149 | 8% | 16% | 5 a day, the most in 5 years | 1 |
| Traincrew | 69 | 4% | 11% | 2 a day, the least in 5 years | - |
| Stations | 10 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 25 | 1% | 5% | 1 a day, more than 3 of the other 4 years | - |
| Operator, other | 90 | 5% | 7% | 3 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 292 |
| IB | Points failure (including no fault found) | 198 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 146 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 136 |
| Q3 | NZ Pumps T | 87 |
| TT | Leaf fall Neutral | 87 |
| JK | Flooding not due to exceptional weather | 73 |
| MD | Technical failures below the solebar | 55 |
| ON | Delays not properly investigated by Network Rail | 55 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 53 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 4,935 |
| MD | Technical failures below the solebar | 3,048 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 2,272 |
| TG | Driver | 1,923 |
| IC | Track circuit failure (including no fault found) | 1,911 |
| IB | Points failure (including no fault found) | 1,706 |
| J3 | Axle Counter Failure | 1,456 |
| T2 | Delay at unstaffed station to non-DOO train | 1,392 |
| X4 | Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions | 1,235 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 1,221 |