Hooton
865 delay minutes
Most of the delay picked up at Hooton in the four weeks to 9 December 2023 came from faulty trains.
46% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 6 | <1% | 8% | 0 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 71 | 8% | 16% | 3 a day, the most in 5 years | - |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | - |
| Autumn | 85 | 10% | 7% | 3 a day, the most in 5 years | - |
| External | 47 | 5% | 4% | 2 a day, the most in 5 years | 2 |
| Network management | 53 | 6% | 17% | 2 a day, more than 2 of the other 4 years | 4 |
| The operators' causes | |||||
| Train faults | 516 | 60% | 16% | 18 a day, the most in 5 years | 20 |
| Traincrew | 49 | 6% | 11% | 2 a day, the most in 5 years | 1 |
| Stations | 3 | <1% | 3% | 0 a day, more than 1 of the other 4 years | - |
| Operations | 20 | 2% | 5% | 1 a day, more than 2 of the other 4 years | - |
| Operator, other | 18 | 2% | 7% | 1 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 190 |
| M7 | Door and Door system faults | 125 |
| M0 | Confirmed train cab based safety system fault (including GSMR) | 74 |
| Q3 | NZ Pumps T | 61 |
| IC | Track circuit failure (including no fault found) | 60 |
| M8 | Technical failures above the Solebar | 60 |
| MT | Confirmed train borne safety system faults (not cab based) | 36 |
| XB | Vandalism or theft (including the placing of objects on the line) | 34 |
| TH | (Senior) Conductor/Train Manager | 30 |
| QI | Cautioning due to railhead leaf contamination | 24 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 1,521 |
| MD | Technical failures below the solebar | 1,440 |
| X2 | Severe flooding beyond that which could be mitigated on Network Rail infrastructure | 1,037 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 751 |
| TH | (Senior) Conductor/Train Manager | 660 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 536 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 514 |
| M8 | Technical failures above the Solebar | 500 |
| XP | BRIDGE HIT | 456 |
| IE | Signalling Functional Power Supply Failure | 439 |