865 delay minutes

Most of the delay picked up at Hooton in the four weeks to 9 December 2023 came from faulty trains.

46% of these minutes were knock-on from something that happened elsewhere first. 99% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track6<1%8% 0 a day, more than 2 of the other 4 years-
Signals, points and power718%16% 3 a day, the most in 5 years-
Weather and structures--7% 0 a day, the least in 5 years-
Autumn8510%7% 3 a day, the most in 5 years-
External475%4% 2 a day, the most in 5 years2
Network management536%17% 2 a day, more than 2 of the other 4 years4
The operators' causes
Train faults51660%16% 18 a day, the most in 5 years20
Traincrew496%11% 2 a day, the most in 5 years1
Stations3<1%3% 0 a day, more than 1 of the other 4 years-
Operations202%5% 1 a day, more than 2 of the other 4 years-
Operator, other182%7% 1 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar190
M7Door and Door system faults125
M0Confirmed train cab based safety system fault (including GSMR)74
Q3NZ Pumps T61
ICTrack circuit failure (including no fault found)60
M8Technical failures above the Solebar60
MTConfirmed train borne safety system faults (not cab based)36
XBVandalism or theft (including the placing of objects on the line)34
TH(Senior) Conductor/Train Manager30
QICautioning due to railhead leaf contamination24
Since 2018
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)1,521
MDTechnical failures below the solebar1,440
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure1,037
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)751
TH(Senior) Conductor/Train Manager660
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)536
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure514
M8Technical failures above the Solebar500
XPBRIDGE HIT456
IESignalling Functional Power Supply Failure439