Hope (Derbyshire)
0 delay minutes
No delay was picked up at Hope (Derbyshire) in the four weeks to 9 December 2023.
100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | - | - | 16% | - |
| Weather and structures | - | - | 7% | - |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | - |
| The operators' causes | ||||
| Train faults | - | - | 16% | - |
| Traincrew | - | - | 11% | - |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Nothing logged. | ||
| Code | What Network Rail logged | Minutes |
|---|---|---|
| I8 | Animal Strike or Incursion within the control of Network Rail | 68 |
| IH | Power Supply And Distribution System Failure | 51 |
| FO | Time Lost en-route believed to be operator cause and information required from Operator (Ops Responsibility) | 34 |
| M7 | Door and Door system faults | 28 |
| IA | Signal failure (including no fault found) | 25 |
| OV | Fire or evacuation due to fire alarm of Network Rail buildings other than stations not due to vandalism | 23 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 19 |
| M8 | Technical failures above the Solebar | 18 |
| RM | Waiting connections from other transport modes | 18 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 16 |