Henley-on-Thames
248 delay minutes
The biggest share (30%) of the delay picked up at Henley-on-Thames in the four weeks to 9 December 2023 came from track faults.
92% of these minutes were knock-on from something that happened elsewhere first. 78% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 75 | 30% | 8% | 3 a day, the most in 5 years | 5 |
| Signals, points and power | 22 | 9% | 16% | 1 a day, more than 1 of the other 4 years | 1 |
| Weather and structures | - | - | 7% | 0 a day, the least in 5 years | 1 |
| Autumn | 11 | 4% | 7% | 0 a day, more than 3 of the other 4 years | - |
| External | 7 | 3% | 4% | 0 a day, more than 3 of the other 4 years | 1 |
| Network management | 37 | 15% | 17% | 1 a day, more than 3 of the other 4 years | 1 |
| The operators' causes | |||||
| Train faults | 65 | 26% | 16% | 2 a day, more than 3 of the other 4 years | - |
| Traincrew | 14 | 6% | 11% | 1 a day, more than 2 of the other 4 years | 7 |
| Stations | - | - | 3% | 0 a day, the least in 5 years | - |
| Operations | 17 | 7% | 5% | 1 a day, the most in 5 years | - |
| Operator, other | - | - | 7% | 0 a day, the least in 5 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| MD | Technical failures below the solebar | 42 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 41 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 27 |
| OU | Delays not Investigated by Network Rail | 15 |
| IB | Points failure (including no fault found) | 14 |
| TG | Driver | 14 |
| TZ | Other Passenger Train Operating Company causes | 14 |
| MY | Coupler, Coupler system and Jumper cable faults | 11 |
| QI | Cautioning due to railhead leaf contamination | 11 |
| I1 | Overhead line/third rail defect | 8 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| JH | Critical Rail Temperature speeds, (other than buckled rails) | 593 |
| MD | Technical failures below the solebar | 502 |
| TG | Driver | 467 |
| M8 | Technical failures above the Solebar | 441 |
| M7 | Door and Door system faults | 364 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 280 |
| ZU | No Cause Identified After investigation by both Parties | 253 |
| MU | Depot operating problem | 228 |
| JL | Safety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff) | 222 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 218 |