248 delay minutes

The biggest share (30%) of the delay picked up at Henley-on-Thames in the four weeks to 9 December 2023 came from track faults.

92% of these minutes were knock-on from something that happened elsewhere first. 78% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track7530%8% 3 a day, the most in 5 years5
Signals, points and power229%16% 1 a day, more than 1 of the other 4 years1
Weather and structures--7% 0 a day, the least in 5 years1
Autumn114%7% 0 a day, more than 3 of the other 4 years-
External73%4% 0 a day, more than 3 of the other 4 years1
Network management3715%17% 1 a day, more than 3 of the other 4 years1
The operators' causes
Train faults6526%16% 2 a day, more than 3 of the other 4 years-
Traincrew146%11% 1 a day, more than 2 of the other 4 years7
Stations--3% 0 a day, the least in 5 years-
Operations177%5% 1 a day, the most in 5 years-
Operator, other--7% 0 a day, the least in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 10 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
MDTechnical failures below the solebar42
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.41
IRBroken/cracked/twisted/buckled/flawed rail27
OUDelays not Investigated by Network Rail15
IBPoints failure (including no fault found)14
TGDriver14
TZOther Passenger Train Operating Company causes14
MYCoupler, Coupler system and Jumper cable faults11
QICautioning due to railhead leaf contamination11
I1Overhead line/third rail defect8
Since 2018
CodeWhat Network Rail loggedMinutes
JHCritical Rail Temperature speeds, (other than buckled rails)593
MDTechnical failures below the solebar502
TGDriver467
M8Technical failures above the Solebar441
M7Door and Door system faults364
MNBrake and brake systems faults; including wheel flats where no other cause had been identified280
ZUNo Cause Identified After investigation by both Parties253
MUDepot operating problem228
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)222
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.218