Leaves on the Line

Harpenden

HPD East Midlands route
CSV JSON

0 delay minutes

No delay was picked up at Harpenden in the four weeks to 9 December 2023.

100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideTrains cancelled
Network Rail's causes
Track--8%-
Signals, points and power--16%-
Weather and structures--7%-
Autumn--7%-
External--4%-
Network management--17%-
The operators' causes
Train faults--16%-
Traincrew--11%-
Stations--3%-
Operations--5%-
Operator, other--7%-

Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.

Period by period

Delay minutes a day, period by period. Gridlines every 1 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Nothing logged.
Since 2018
CodeWhat Network Rail loggedMinutes
TITraincrew rostering problem62
J8OTM DAMAGE56
I1Overhead line/third rail defect36
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)34
M8Technical failures above the Solebar34
ICTrack circuit failure (including no fault found)31
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions22
X2Severe flooding beyond that which could be mitigated on Network Rail infrastructure21
T3Waiting connections from other transport modes16
JLSafety related incident caused by maintenance or infrastructure staff oversight or error (not Operations staff)9