Harrington
40 delay minutes
Most of the delay picked up at Harrington in the four weeks to 9 December 2023 came from signal, points and power faults.
0% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | Trains cancelled |
|---|---|---|---|---|
| Network Rail's causes | ||||
| Track | - | - | 8% | - |
| Signals, points and power | 40 | 100% | 16% | - |
| Weather and structures | - | - | 7% | 1 |
| Autumn | - | - | 7% | - |
| External | - | - | 4% | - |
| Network management | - | - | 17% | 2 |
| The operators' causes | ||||
| Train faults | - | - | 16% | 2 |
| Traincrew | - | - | 11% | 1 |
| Stations | - | - | 3% | - |
| Operations | - | - | 5% | - |
| Operator, other | - | - | 7% | - |
Quiet enough here (under 100 delay minutes a period on average) that comparing years would mostly be noise, so there's no comparison.
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IA | Signal failure (including no fault found) | 40 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IA | Signal failure (including no fault found) | 108 |
| AK | Safety Ins and mishaps(derailments, fire, chemical spill) in off n/w freight yard or terminal (inc private sdgs affecting FOC | 32 |
| RC | re-booked assistance for a person with reduced mobility joining/alighting, | 21 |
| TG | Driver | 14 |
| IC | Track circuit failure (including no fault found) | 7 |
| Q1 | Takeback Pumps | 6 |
| TZ | Other Passenger Train Operating Company causes | 6 |