Leaves on the Line

Horsforth

HRS North & East route
CSV JSON

1,743 delay minutes

The biggest share (25%) of the delay picked up at Horsforth in the four weeks to 9 December 2023 came from autumn leaves.

40% of these minutes were knock-on from something that happened elsewhere first. 85% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track261%8% 1 a day, more than 1 of the other 4 years-
Signals, points and power1227%16% 4 a day, the most in 5 years-
Weather and structures31418%7% 11 a day, more than 3 of the other 4 years4
Autumn43825%7% 16 a day, more than 2 of the other 4 years-
External282%4% 1 a day, the most in 5 years1
Network management19111%17% 7 a day, the most in 5 years2
The operators' causes
Train faults1297%16% 5 a day, more than 1 of the other 4 years-
Traincrew543%11% 2 a day, more than 2 of the other 4 years-
Stations13<1%3% 0 a day, the least in 5 years-
Operations251%5% 1 a day, more than 1 of the other 4 years-
Operator, other40323%7% 14 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 20 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T386
TTLeaf fall Neutral366
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail150
OUDelays not Investigated by Network Rail104
X4Blanket speed restrictions or Key Route Strategy implemented with Group Standards or national operational safety instructions75
M8Technical failures above the Solebar52
JKFlooding not due to exceptional weather51
OMTechnical failure associated with a Railhead conditioning train44
JTPoints failure caused by snow or frost where heaters are not fitted38
ICTrack circuit failure (including no fault found)34
Since 2018
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T4,199
TTLeaf fall Neutral3,442
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)3,252
MDTechnical failures below the solebar2,258
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.1,941
TGDriver1,735
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps1,232
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,184
RBPassengers joining/alighting1,103
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)939