2,173 delay minutes

The biggest share (25%) of the delay picked up at Harrow & Wealdstone in the four weeks to 9 December 2023 came from faulty trains.

74% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track482%8% 2 a day, more than 1 of the other 4 years-
Signals, points and power49223%16% 18 a day, the most in 5 years1
Weather and structures241%7% 1 a day, more than 2 of the other 4 years-
Autumn301%7% 1 a day, more than 3 of the other 4 years-
External9<1%4% 0 a day, more than 1 of the other 4 years-
Network management44821%17% 16 a day, more than 3 of the other 4 years-
The operators' causes
Train faults55325%16% 20 a day, more than 3 of the other 4 years1
Traincrew28013%11% 10 a day, more than 2 of the other 4 years1
Stations553%3% 2 a day, more than 1 of the other 4 years-
Operations824%5% 3 a day, more than 2 of the other 4 years-
Operator, other1547%7% 5 a day, more than 2 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IHPower Supply And Distribution System Failure333
MNBrake and brake systems faults; including wheel flats where no other cause had been identified317
TGDriver213
JPFailure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards93
VHPassenger Communication cord, door egress or emergency train alarm operated73
JXMiscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains)69
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)61
IBPoints failure (including no fault found)57
M8Technical failures above the Solebar54
OBDelayed by signaller not applying applicable regulating policy43
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver10,007
I1Overhead line/third rail defect7,873
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.7,550
IBPoints failure (including no fault found)7,062
J3Axle Counter Failure5,810
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)4,776
IRBroken/cracked/twisted/buckled/flawed rail4,669
ICTrack circuit failure (including no fault found)4,245
M8Technical failures above the Solebar3,645
OCSignaller including mis-routing (not ERTM /ETCS related)3,575