Harrow & Wealdstone
2,173 delay minutes
The biggest share (25%) of the delay picked up at Harrow & Wealdstone in the four weeks to 9 December 2023 came from faulty trains.
74% of these minutes were knock-on from something that happened elsewhere first. 95% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 48 | 2% | 8% | 2 a day, more than 1 of the other 4 years | - |
| Signals, points and power | 492 | 23% | 16% | 18 a day, the most in 5 years | 1 |
| Weather and structures | 24 | 1% | 7% | 1 a day, more than 2 of the other 4 years | - |
| Autumn | 30 | 1% | 7% | 1 a day, more than 3 of the other 4 years | - |
| External | 9 | <1% | 4% | 0 a day, more than 1 of the other 4 years | - |
| Network management | 448 | 21% | 17% | 16 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 553 | 25% | 16% | 20 a day, more than 3 of the other 4 years | 1 |
| Traincrew | 280 | 13% | 11% | 10 a day, more than 2 of the other 4 years | 1 |
| Stations | 55 | 3% | 3% | 2 a day, more than 1 of the other 4 years | - |
| Operations | 82 | 4% | 5% | 3 a day, more than 2 of the other 4 years | - |
| Operator, other | 154 | 7% | 7% | 5 a day, more than 2 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IH | Power Supply And Distribution System Failure | 333 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 317 |
| TG | Driver | 213 |
| JP | Failure to maintain vegetation within network boundaries in accordance with prevailing Network Rail standards | 93 |
| VH | Passenger Communication cord, door egress or emergency train alarm operated | 73 |
| JX | Miscellaneous items on track including litter (not including leaves, result of vandalism, weather or fallen/thrown from trains) | 69 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 61 |
| IB | Points failure (including no fault found) | 57 |
| M8 | Technical failures above the Solebar | 54 |
| OB | Delayed by signaller not applying applicable regulating policy | 43 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 10,007 |
| I1 | Overhead line/third rail defect | 7,873 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 7,550 |
| IB | Points failure (including no fault found) | 7,062 |
| J3 | Axle Counter Failure | 5,810 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 4,776 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 4,669 |
| IC | Track circuit failure (including no fault found) | 4,245 |
| M8 | Technical failures above the Solebar | 3,645 |
| OC | Signaller including mis-routing (not ERTM /ETCS related) | 3,575 |