Haslemere
925 delay minutes
The biggest share (37%) of the delay picked up at Haslemere in the four weeks to 9 December 2023 came from signal, points and power faults.
50% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 5 | <1% | 8% | 0 a day, the least in 5 years | - |
| Signals, points and power | 340 | 37% | 16% | 12 a day, more than 3 of the other 4 years | - |
| Weather and structures | 20 | 2% | 7% | 1 a day, more than 2 of the other 4 years | - |
| Autumn | 93 | 10% | 7% | 3 a day, more than 3 of the other 4 years | - |
| External | 33 | 4% | 4% | 1 a day, more than 3 of the other 4 years | - |
| Network management | 70 | 8% | 17% | 3 a day, the least in 5 years | 2 |
| The operators' causes | |||||
| Train faults | 171 | 18% | 16% | 6 a day, the most in 5 years | - |
| Traincrew | 36 | 4% | 11% | 1 a day, more than 1 of the other 4 years | 6 |
| Stations | 35 | 4% | 3% | 1 a day, the most in 5 years | - |
| Operations | 22 | 2% | 5% | 1 a day, more than 3 of the other 4 years | 2 |
| Operator, other | 101 | 11% | 7% | 4 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| II | Signalling lineside cable fault | 194 |
| Q3 | NZ Pumps T | 89 |
| TT | Leaf fall Neutral | 89 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 60 |
| IB | Points failure (including no fault found) | 33 |
| XN | Road or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes) | 32 |
| MC | Diesel Loco failure, defect, attention | 30 |
| TG | Driver | 30 |
| M8 | Technical failures above the Solebar | 29 |
| MF | Engineering non-technical delays associated with Engineering staff who are not based in an Engineering depot e.g. Cleaners | 27 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| IC | Track circuit failure (including no fault found) | 17,555 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5,356 |
| IV | Cutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure) | 4,255 |
| II | Signalling lineside cable fault | 2,567 |
| ID | Level crossing faults and failure incl. barrow/foot crossings and crossing treadles | 2,375 |
| I4 | OHLE/third rail power supply failure or reduction | 2,180 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 2,041 |
| IF | Train Describer/Panel/ARS/SSI/TDM Remote Control failure | 1,845 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 1,491 |
| MD | Technical failures below the solebar | 1,395 |