Leaves on the Line

Haslemere

HSL Wessex route
CSV JSON

925 delay minutes

The biggest share (37%) of the delay picked up at Haslemere in the four weeks to 9 December 2023 came from signal, points and power faults.

50% of these minutes were knock-on from something that happened elsewhere first. 100% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track5<1%8% 0 a day, the least in 5 years-
Signals, points and power34037%16% 12 a day, more than 3 of the other 4 years-
Weather and structures202%7% 1 a day, more than 2 of the other 4 years-
Autumn9310%7% 3 a day, more than 3 of the other 4 years-
External334%4% 1 a day, more than 3 of the other 4 years-
Network management708%17% 3 a day, the least in 5 years2
The operators' causes
Train faults17118%16% 6 a day, the most in 5 years-
Traincrew364%11% 1 a day, more than 1 of the other 4 years6
Stations354%3% 1 a day, the most in 5 years-
Operations222%5% 1 a day, more than 3 of the other 4 years2
Operator, other10111%7% 4 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
IISignalling lineside cable fault194
Q3NZ Pumps T89
TTLeaf fall Neutral89
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles60
IBPoints failure (including no fault found)33
XNRoad or crossing related incidents inc. cars on line, crossing misuse and priority to emergency services (NOT bridge strikes)32
MCDiesel Loco failure, defect, attention30
TGDriver30
M8Technical failures above the Solebar29
MFEngineering non-technical delays associated with Engineering staff who are not based in an Engineering depot e.g. Cleaners27
Since 2018
CodeWhat Network Rail loggedMinutes
ICTrack circuit failure (including no fault found)17,555
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5,356
IVCutting or embankment earthslip, rock fall or subsidence (not the result of severe weather on the day of failure)4,255
IISignalling lineside cable fault2,567
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles2,375
I4OHLE/third rail power supply failure or reduction2,180
IRBroken/cracked/twisted/buckled/flawed rail2,041
IFTrain Describer/Panel/ARS/SSI/TDM Remote Control failure1,845
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail1,491
MDTechnical failures below the solebar1,395