Hatton (Warks)
530 delay minutes
The biggest share (26%) of the delay picked up at Hatton (Warks) in the four weeks to 9 December 2023 came from how the network was run.
79% of these minutes were knock-on from something that happened elsewhere first. 98% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 30 | 6% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 52 | 10% | 16% | 2 a day, more than 1 of the other 4 years | - |
| Weather and structures | 4 | <1% | 7% | 0 a day, the least in 5 years | - |
| Autumn | 25 | 5% | 7% | 1 a day, more than 1 of the other 4 years | - |
| External | 15 | 3% | 4% | 1 a day, more than 1 of the other 4 years | 1 |
| Network management | 138 | 26% | 17% | 5 a day, more than 1 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 95 | 18% | 16% | 3 a day, the least in 5 years | - |
| Traincrew | 79 | 15% | 11% | 3 a day, more than 1 of the other 4 years | - |
| Stations | 28 | 5% | 3% | 1 a day, more than 1 of the other 4 years | - |
| Operations | 11 | 2% | 5% | 0 a day, the least in 5 years | - |
| Operator, other | 53 | 10% | 7% | 2 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 53 |
| OS | Late start or delays to Railhead Conditioning or Ghost Train due to its own activity and not in reaction to another incident | 45 |
| MD | Technical failures below the solebar | 40 |
| M8 | Technical failures above the Solebar | 34 |
| IB | Points failure (including no fault found) | 29 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 25 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 22 |
| TT | Leaf fall Neutral | 22 |
| Q3 | NZ Pumps T | 18 |
| RB | Passengers joining/alighting | 15 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 2,917 |
| IB | Points failure (including no fault found) | 2,210 |
| MD | Technical failures below the solebar | 1,991 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 1,673 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 1,591 |
| JD | Structures - Bridges/tunnels/buildings/retaining walls/sea defences (not bridge strikes) | 1,419 |
| MC | Diesel Loco failure, defect, attention | 1,218 |
| M8 | Technical failures above the Solebar | 1,138 |
| ZU | No Cause Identified After investigation by both Parties | 1,123 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,098 |