Huddersfield
4,631 delay minutes
The biggest share (20%) of the delay picked up at Huddersfield in the four weeks to 9 December 2023 came from faulty trains.
75% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 315 | 7% | 8% | 11 a day, more than 3 of the other 4 years | 10 |
| Signals, points and power | 445 | 10% | 16% | 16 a day, more than 2 of the other 4 years | 2 |
| Weather and structures | 326 | 7% | 7% | 12 a day, the most in 5 years | 3 |
| Autumn | 496 | 11% | 7% | 18 a day, more than 2 of the other 4 years | 2 |
| External | 183 | 4% | 4% | 7 a day, more than 3 of the other 4 years | 1 |
| Network management | 642 | 14% | 17% | 23 a day, more than 2 of the other 4 years | 61 |
| The operators' causes | |||||
| Train faults | 939 | 20% | 16% | 34 a day, more than 3 of the other 4 years | 15 |
| Traincrew | 776 | 17% | 11% | 28 a day, more than 3 of the other 4 years | 78 |
| Stations | 122 | 3% | 3% | 4 a day, the least in 5 years | - |
| Operations | 196 | 4% | 5% | 7 a day, more than 2 of the other 4 years | 5 |
| Operator, other | 194 | 4% | 7% | 7 a day, more than 1 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 536 |
| MU | Depot operating problem | 300 |
| MD | Technical failures below the solebar | 291 |
| QJ | Special working for leaf-fall track circuit operation | 291 |
| OU | Delays not Investigated by Network Rail | 261 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 217 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 158 |
| TH | (Senior) Conductor/Train Manager | 155 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 150 |
| XO | External trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism) | 148 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 18,538 |
| MD | Technical failures below the solebar | 11,813 |
| TH | (Senior) Conductor/Train Manager | 7,233 |
| M8 | Technical failures above the Solebar | 6,161 |
| IS | Track defects (other than rail defects) inc. fish plates, wet beds etc. | 5,950 |
| M7 | Door and Door system faults | 5,506 |
| IC | Track circuit failure (including no fault found) | 5,349 |
| MU | Depot operating problem | 5,069 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 4,697 |
| MS | Planned underpowered or shortformed service and or vehicle, incl. exam set swaps | 4,598 |