4,631 delay minutes

The biggest share (20%) of the delay picked up at Huddersfield in the four weeks to 9 December 2023 came from faulty trains.

75% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track3157%8% 11 a day, more than 3 of the other 4 years10
Signals, points and power44510%16% 16 a day, more than 2 of the other 4 years2
Weather and structures3267%7% 12 a day, the most in 5 years3
Autumn49611%7% 18 a day, more than 2 of the other 4 years2
External1834%4% 7 a day, more than 3 of the other 4 years1
Network management64214%17% 23 a day, more than 2 of the other 4 years61
The operators' causes
Train faults93920%16% 34 a day, more than 3 of the other 4 years15
Traincrew77617%11% 28 a day, more than 3 of the other 4 years78
Stations1223%3% 4 a day, the least in 5 years-
Operations1964%5% 7 a day, more than 2 of the other 4 years5
Operator, other1944%7% 7 a day, more than 1 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 100 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver536
MUDepot operating problem300
MDTechnical failures below the solebar291
QJSpecial working for leaf-fall track circuit operation291
OUDelays not Investigated by Network Rail261
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail217
IRBroken/cracked/twisted/buckled/flawed rail158
TH(Senior) Conductor/Train Manager155
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.150
XOExternal trees, building or structures encroaching or falling onto network infrastructure (not weather or vandalism)148
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver18,538
MDTechnical failures below the solebar11,813
TH(Senior) Conductor/Train Manager7,233
M8Technical failures above the Solebar6,161
ISTrack defects (other than rail defects) inc. fish plates, wet beds etc.5,950
M7Door and Door system faults5,506
ICTrack circuit failure (including no fault found)5,349
MUDepot operating problem5,069
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)4,697
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps4,598