Leaves on the Line

Hull

HUL North & East route
CSV JSON

4,584 delay minutes

The biggest share (19%) of the delay picked up at Hull in the four weeks to 9 December 2023 came from faulty trains.

58% of these minutes were knock-on from something that happened elsewhere first. 91% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track1734%8% 6 a day, more than 1 of the other 4 years-
Signals, points and power68015%16% 24 a day, more than 2 of the other 4 years3
Weather and structures2265%7% 8 a day, the most in 5 years5
Autumn4349%7% 15 a day, more than 3 of the other 4 years-
External2425%4% 9 a day, the most in 5 years3
Network management56812%17% 20 a day, more than 3 of the other 4 years34
The operators' causes
Train faults88319%16% 32 a day, more than 3 of the other 4 years32
Traincrew81018%11% 29 a day, the most in 5 years128
Stations2105%3% 7 a day, the most in 5 years3
Operations832%5% 3 a day, more than 1 of the other 4 years2
Operator, other2776%7% 10 a day, the most in 5 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
TGDriver559
MDTechnical failures below the solebar305
OUDelays not Investigated by Network Rail257
Q3NZ Pumps T240
TTLeaf fall Neutral226
TH(Senior) Conductor/Train Manager197
ICTrack circuit failure (including no fault found)175
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail174
QJSpecial working for leaf-fall track circuit operation166
MUDepot operating problem146
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver11,566
MDTechnical failures below the solebar9,581
JSCondition of Track TSR outside the Timetable Planning Rules7,514
M8Technical failures above the Solebar5,995
MSPlanned underpowered or shortformed service and or vehicle, incl. exam set swaps5,950
IDLevel crossing faults and failure incl. barrow/foot crossings and crossing treadles5,702
MUDepot operating problem4,963
M7Door and Door system faults4,274
TH(Senior) Conductor/Train Manager4,115
MNBrake and brake systems faults; including wheel flats where no other cause had been identified3,779