Leaves on the Line

Huyton

HUY North West route
CSV JSON

2,369 delay minutes

The biggest share (19%) of the delay picked up at Huyton in the four weeks to 9 December 2023 came from autumn leaves.

64% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.

By cause

Delay minutes by cause in 2023-24 P09
CauseMinutesShareNetwork-wideA day, against the same period other yearsTrains cancelled
Network Rail's causes
Track331%8% 1 a day, more than 2 of the other 4 years-
Signals, points and power25311%16% 9 a day, more than 2 of the other 4 years-
Weather and structures1707%7% 6 a day, more than 3 of the other 4 years-
Autumn46119%7% 16 a day, more than 3 of the other 4 years-
External522%4% 2 a day, more than 3 of the other 4 years-
Network management29012%17% 10 a day, more than 3 of the other 4 years-
The operators' causes
Train faults1928%16% 7 a day, more than 1 of the other 4 years-
Traincrew27512%11% 10 a day, more than 3 of the other 4 years-
Stations542%3% 2 a day, the least in 5 years-
Operations1436%5% 5 a day, more than 3 of the other 4 years-
Operator, other44819%7% 16 a day, more than 3 of the other 4 years-

Period by period

Delay minutes a day, period by period. Gridlines every 50 minutes. Hatched periods were under 94% agreed when their file came out, so they may still move. Pick a bar to see that period.

The codes behind it

In 2023-24 P09
CodeWhat Network Rail loggedMinutes
Q3NZ Pumps T318
TTLeaf fall Neutral278
TGDriver170
XWSevere weather not snow affecting infrastructure the responsibility of Network Rail134
MPRail / wheel interface, adhesion problems (including ice on the running rail)116
QICautioning due to railhead leaf contamination99
ICTrack circuit failure (including no fault found)98
TH(Senior) Conductor/Train Manager78
OUDelays not Investigated by Network Rail59
T8Delays at Station believed to be operator cause and Information required from operator (Ops responsibility)56
Since 2018
CodeWhat Network Rail loggedMinutes
TGDriver6,127
MDTechnical failures below the solebar4,254
Q3NZ Pumps T3,096
ZSNo Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties)3,060
TTLeaf fall Neutral2,422
TOTime lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility)2,351
M7Door and Door system faults1,991
MNBrake and brake systems faults; including wheel flats where no other cause had been identified1,985
TH(Senior) Conductor/Train Manager1,941
IRBroken/cracked/twisted/buckled/flawed rail1,923