Huyton
2,369 delay minutes
The biggest share (19%) of the delay picked up at Huyton in the four weeks to 9 December 2023 came from autumn leaves.
64% of these minutes were knock-on from something that happened elsewhere first. 87% of them were agreed between Network Rail and the operators when the file came out on 5 Jan 2024, so they may still move.
By cause
| Cause | Minutes | Share | Network-wide | A day, against the same period other years | Trains cancelled |
|---|---|---|---|---|---|
| Network Rail's causes | |||||
| Track | 33 | 1% | 8% | 1 a day, more than 2 of the other 4 years | - |
| Signals, points and power | 253 | 11% | 16% | 9 a day, more than 2 of the other 4 years | - |
| Weather and structures | 170 | 7% | 7% | 6 a day, more than 3 of the other 4 years | - |
| Autumn | 461 | 19% | 7% | 16 a day, more than 3 of the other 4 years | - |
| External | 52 | 2% | 4% | 2 a day, more than 3 of the other 4 years | - |
| Network management | 290 | 12% | 17% | 10 a day, more than 3 of the other 4 years | - |
| The operators' causes | |||||
| Train faults | 192 | 8% | 16% | 7 a day, more than 1 of the other 4 years | - |
| Traincrew | 275 | 12% | 11% | 10 a day, more than 3 of the other 4 years | - |
| Stations | 54 | 2% | 3% | 2 a day, the least in 5 years | - |
| Operations | 143 | 6% | 5% | 5 a day, more than 3 of the other 4 years | - |
| Operator, other | 448 | 19% | 7% | 16 a day, more than 3 of the other 4 years | - |
Period by period
The codes behind it
| Code | What Network Rail logged | Minutes |
|---|---|---|
| Q3 | NZ Pumps T | 318 |
| TT | Leaf fall Neutral | 278 |
| TG | Driver | 170 |
| XW | Severe weather not snow affecting infrastructure the responsibility of Network Rail | 134 |
| MP | Rail / wheel interface, adhesion problems (including ice on the running rail) | 116 |
| QI | Cautioning due to railhead leaf contamination | 99 |
| IC | Track circuit failure (including no fault found) | 98 |
| TH | (Senior) Conductor/Train Manager | 78 |
| OU | Delays not Investigated by Network Rail | 59 |
| T8 | Delays at Station believed to be operator cause and Information required from operator (Ops responsibility) | 56 |
| Code | What Network Rail logged | Minutes |
|---|---|---|
| TG | Driver | 6,127 |
| MD | Technical failures below the solebar | 4,254 |
| Q3 | NZ Pumps T | 3,096 |
| ZS | No Cause ascertainable for a Sub-Threshold Delay causing Threshold Reactionary (where agreed by both parties) | 3,060 |
| TT | Leaf fall Neutral | 2,422 |
| TO | Time lost en-route believed to be Operator cause and information required form operatore (Ops Responsibility) | 2,351 |
| M7 | Door and Door system faults | 1,991 |
| MN | Brake and brake systems faults; including wheel flats where no other cause had been identified | 1,985 |
| TH | (Senior) Conductor/Train Manager | 1,941 |
| IR | Broken/cracked/twisted/buckled/flawed rail | 1,923 |